Maryland transportation authority decided to setup toll booths on either side of the Fort McHenry tunnel due to increased traffic. After studying the traffic patterns, MTA found that peak traffic occurs in the evenings on Friday and Saturday. On average, 3900 vehicles per hour pass through the tunnel each way during peak times. The vehicles need to go through the toll booths. MTA would like to keep the average time spent at each toll booth to less than 2 minutes. How many lanes should MTA open if they do not want to have more than 10 vehicles waiting in line (on average)? Hint: Start by calculating the number of cars waiting as if there is only one toll booth (i.e., calculate L using the information). Then calculate the number of toll booths needed if each booth is limited to 10 vehicles. NOTE: Round up your answer. For example, if you get an answer of 8.86 then round up the answer to 9.
Maryland transportation authority decided to setup toll booths on either side of the Fort McHenry tunnel due to increased traffic. After studying the traffic patterns, MTA found that peak traffic occurs in the evenings on Friday and Saturday. On average, 3900 vehicles per hour pass through the tunnel each way during peak times. The vehicles need to go through the toll booths. MTA would like to keep the average time spent at each toll booth to less than 2 minutes. How many lanes should MTA open if they do not want to have more than 10 vehicles waiting in line (on average)? Hint: Start by calculating the number of cars waiting as if there is only one toll booth (i.e., calculate L using the information). Then calculate the number of toll booths needed if each booth is limited to 10 vehicles. NOTE: Round up your answer. For example, if you get an answer of 8.86 then round up the answer to 9.
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
![Maryland transportation authority decided to
setup toll booths on either side of the Fort
McHenry tunnel due to increased traffic.
After studying the traffic patterns, MTA found
that peak traffic occurs in the evenings on
Friday and Saturday. On average, 3900
vehicles per hour pass through the tunnel
each way during peak times. The vehicles
need to go through the toll booths. MTA
would like to keep the average time spent at
each toll booth to less than 2 minutes. How
many lanes should MTA open if they do not
want to have more than 10 vehicles waiting
in line (on average)?
Hint: Start by calculating the number of cars
waiting as if there is only one toll booth (i.e.,
calculate L using the information). Then
calculate the number of toll booths needed if
each booth is limited to 10 vehicles.
NOTE: Round up your answer. For example, if
you get an answer of 8.86 then round up the
answer to 9.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fd98e596e-7138-423c-ad4a-7c4a4136380c%2F53d74338-4aa5-4f1e-913a-abe05ae4b99b%2F3xsus7u_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Maryland transportation authority decided to
setup toll booths on either side of the Fort
McHenry tunnel due to increased traffic.
After studying the traffic patterns, MTA found
that peak traffic occurs in the evenings on
Friday and Saturday. On average, 3900
vehicles per hour pass through the tunnel
each way during peak times. The vehicles
need to go through the toll booths. MTA
would like to keep the average time spent at
each toll booth to less than 2 minutes. How
many lanes should MTA open if they do not
want to have more than 10 vehicles waiting
in line (on average)?
Hint: Start by calculating the number of cars
waiting as if there is only one toll booth (i.e.,
calculate L using the information). Then
calculate the number of toll booths needed if
each booth is limited to 10 vehicles.
NOTE: Round up your answer. For example, if
you get an answer of 8.86 then round up the
answer to 9.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.