Manufacturing Cycle Efficiency Waymouth Manufacturing operates a contract manufacturingplant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factorfor Waymouth, which has developed a number of measures of manufacturing speed. Waymouthhas studied the matter and found that competitive contract manufacturers have manufacturing cycleefficiency (MCE) of about 40%. When last calculated, Waymouth’s MCE was 35%.Key measures from the recent month’s production, averaged over all the jobs during that period,are as follows:[LO 13-2]Activity Average Time (hours)New product development 30Materials handling 2Order setup 6Machine maintenance 3Order scheduling 1Inspection of completed order 5Pack and move to storage or ship 2Manufacturing assembly 24Order taking and checking 3Receiving and stocking raw materials 6Inspection of raw materials at start of production 2Required Determine the manufacturing cycle efficiency (MCE) for the recent month. What can you inferfrom the MCE you calculated?
Manufacturing Cycle Efficiency Waymouth Manufacturing operates a contract manufacturing
plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor
for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth
has studied the matter and found that competitive contract manufacturers have manufacturing cycle
efficiency (MCE) of about 40%. When last calculated, Waymouth’s MCE was 35%.
Key measures from the recent month’s production, averaged over all the jobs during that period,
are as follows:
[LO 13-2]
Activity Average Time (hours)
New product development 30
Materials handling 2
Order setup 6
Machine maintenance 3
Order
Inspection of completed order 5
Pack and move to storage or ship 2
Manufacturing assembly 24
Order taking and checking 3
Receiving and stocking raw materials 6
Inspection of raw materials at start of production 2
Required Determine the manufacturing cycle efficiency (MCE) for the recent month. What can you infer
from the MCE you calculated?
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 2 images