Leija Manufacturing Company uses a job-order costing system and started the month of March with one job in process (Job #359). This job had $500 of cost assigned to it at this time. During March, Leija assigned production costs as follows to the jobs worked on during the month: Total cost assigned to jobs during March: Job 359 6,000 Job 360 8,100 Job 361 2,400 During March, Leija completed and sold Job #359. Job #360 was also completed but was not sold by month end. Job #361 was not completed by the end of March. A. What is Leija's work in process inventory balance at the end of March? B. What is Leija's cost of goods manufactured for March?
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Leija Manufacturing Company uses a
Total cost assigned to jobs during March:
Job 359 | 6,000 |
Job 360 | 8,100 |
Job 361 | 2,400 |
During March, Leija completed and sold Job #359. Job #360 was also completed but was not sold by month end. Job #361 was not completed by the end of March.
A. What is Leija's work in process inventory balance at the end of March?
B. What is Leija's cost of goods manufactured for March?