Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.00 Direct labor cost per unit 15.00 18.10 Sales price per unit 82.80 105.00 Expected production per month 1,240 units 900 units Keller has monthly overhead of $12,053, which is divided into the following cost pools: Setup costs $ 2,900 Quality control 6,195 Maintenance 2,958 Total $ 12,053 The company has also compiled the following information about the chosen cost drivers: Sandy Beach Rocky River Total Number of setups 11 39 50 Number of inspections 100 425 525 Number of machine hours 1,450 1,450 2,900 4. Select the appropriate cost driver for each cost pool and calculate the activity rates if Keller wanted to implement an ABC system. (Round your answers to 2 decimal places.) Setup Costs Setups Quality Control Inspections Maintenance Machine Hours 5. Assuming an ABC system, assign overhead costs to each product based on activity demands.(Round your intermediate calculations to 2 decimal places and final answers to the nearest whole dollar amount.) Overhead Assigned To Sandy Beach Overhead Assigned To Rocky River Setup Cost Quality Control Maintenance Total Overhead Cost $0 $0 6. Calculate the production cost per unit for each of Keller’s products with an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.) Sandy Beach Rocky River Unit Cost
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows:
Sandy Beach | Rocky River | |||||
Direct materials cost per unit | $ | 19.60 | $ | 27.00 | ||
Direct labor cost per unit | 15.00 | 18.10 | ||||
Sales price per unit | 82.80 | 105.00 | ||||
Expected production per month | 1,240 | units | 900 | units | ||
Keller has monthly
Setup costs | $ | 2,900 |
Quality control | 6,195 | |
Maintenance | 2,958 | |
Total | $ | 12,053 |
The company has also compiled the following information about the chosen cost drivers:
Sandy Beach | Rocky River | Total | |
Number of setups | 11 | 39 | 50 |
Number of inspections | 100 | 425 | 525 |
Number of machine hours | 1,450 | 1,450 | 2,900 |
4. Select the appropriate cost driver for each cost pool and calculate the activity rates if Keller wanted to implement an ABC system. (Round your answers to 2 decimal places.)
|
5. Assuming an ABC system, assign overhead costs to each product based on activity demands.(Round your intermediate calculations to 2 decimal places and final answers to the nearest whole dollar amount.)
Overhead Assigned To Sandy Beach | Overhead Assigned To Rocky River | |
Setup Cost | ||
Quality Control | ||
Maintenance | ||
Total Overhead Cost | $0 | $0 |
6. Calculate the production cost per unit for each of Keller’s products with an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.)
|
7. Calculate Keller’s gross margin per unit for each product under an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.)
|
8. Compare the gross margin per unit of each product under the traditional system and ABC. (Round your answers to 2 decimal places.)
|
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 3 images