Given the following notes for three irregular sections, compute the volume of earthwork lying between station sta. 1+200 and sta. 1+240 by (a) the average-end area method; and (b) by the prismoidal formula. The road bed width is 20 m and the side slopes 1.5:1. Determine the difference in volume between average-end area method and prismoidal method in cu. meter. (Hint: the computed area in sta. 1+220 is the Am). Sta. 1+200 Sta. 1+220 F1.5 12.3 A F1.9 12.8 B F2.3 9.7 B F2.0 10.3 F2.3 6.3 с F4.7 7.7 D F3.1 2.5 D F3.1 0 E F2.7 0 E F3.1 3.7 F2.6 4.5 F F3.8 9.9 G F44 14.1 G F1.8 12.7 H F6.6 20.0

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 17P: The following table shows the stations and ordinates for a mass diagram. The free-haul distance is...
icon
Related questions
icon
Concept explainers
Question
Given the following notes for three irregular sections, compute the volume of
earthwork lying between station sta. 1+200 and sta. 1+240 by (a) the average-end
area method; and (b) by the prismoidal formula. The road bed width is 20 m and the
side slopes 1.5:1. Determine the difference in volume between average-end area
method and prismoidal method in cu. meter. (Hint: the computed area in sta. 1+220 is
the Am).
Sta. 1+200
A
в
D
E
F
H
F1.5
123
F4.4
14.1
F2.3
F2.3
F3.1
F2.7
F2.6
F6.6
9.7
6.3
2.5
4.5
20.0
Sta. 1+220
A
B
D
E
F
F1.9
F2.0
F4.7
F3.1
F3.1
F3.8
F1.8
12.8
10.3
7.7
3.7
9.9
12.7
Sta. 1+240
A
B
D
E
F
F0.6
F1.3
F0.8
F1.7
F1.7
F3.4
F2.5
F3.4
10.9
9.6
6.7
2.0
3.9
10.4
15.1
Transcribed Image Text:Given the following notes for three irregular sections, compute the volume of earthwork lying between station sta. 1+200 and sta. 1+240 by (a) the average-end area method; and (b) by the prismoidal formula. The road bed width is 20 m and the side slopes 1.5:1. Determine the difference in volume between average-end area method and prismoidal method in cu. meter. (Hint: the computed area in sta. 1+220 is the Am). Sta. 1+200 A в D E F H F1.5 123 F4.4 14.1 F2.3 F2.3 F3.1 F2.7 F2.6 F6.6 9.7 6.3 2.5 4.5 20.0 Sta. 1+220 A B D E F F1.9 F2.0 F4.7 F3.1 F3.1 F3.8 F1.8 12.8 10.3 7.7 3.7 9.9 12.7 Sta. 1+240 A B D E F F0.6 F1.3 F0.8 F1.7 F1.7 F3.4 F2.5 F3.4 10.9 9.6 6.7 2.0 3.9 10.4 15.1
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Pricing concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning