Five years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam. Last winter a 100-year flood caused extensive damage both to the dam and to the surrounding area. This was not surprising, since the dam was designed for a 50-year flood. The cost to repair the dam now will be $250,000. Damage in the valley below amounts to $750,000. If the spillway is redesigned at a cost of $250,000 and the dam is repaired for another $250,000, the dam may be expected to withstand a 100-year flood without sustaining damage. However, the storage capacity of the dam will not be increased and the probability of damage to the surrounding area below the dam will be unchanged. A second dam can be constructed up the river from the existing dam for $1 million. The capacity of the second dam would be more than adequate to provide the desired flood protection. If the second dam is built, redesign of the existing dam spillway will not be necessary, but the $250,000 of repairs must be done. The development in the area below the dam is expected to be completed in 10 years. A new 100-year flood in the meantime would cause a $1 million loss. After 10 years the loss would be $2 million. In addition, there would be $250,000 of spillway damage if the spillway is not redesigned. A 50year flood is also likely to cause about $200,000 of damage, but the spillway would be adequate. Similarly, a 25-year flood would cause about $50,000 of damage. There are three alternatives: (1) repair the existing dam for $250,000 but make no other alterations, (2) repair the existing dam ($250,000) and redesign the spillway to take a 100-year flood ($250,000), and (3) repair the existing dam ($250,000) and build the second dam ($1 million). Based on an expected annual cash flow analysis, and a 7% interest rate, which alternative should be selected? Draw a decision tree to clearly describe the problem.

ENGR.ECONOMIC ANALYSIS
14th Edition
ISBN:9780190931919
Author:NEWNAN
Publisher:NEWNAN
Chapter1: Making Economics Decisions
Section: Chapter Questions
Problem 1QTC
icon
Related questions
Question

Five years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam. Last winter a 100-year flood caused extensive damage both to the dam and to the surrounding area. This was not surprising, since the dam was designed for a 50-year flood. The cost to repair the dam now will be $250,000. Damage in the valley below amounts to $750,000. If the spillway is redesigned at a cost of $250,000 and the dam is repaired for another $250,000, the dam may be expected to withstand a 100-year flood without sustaining damage. However, the storage capacity of the dam will not be increased and the probability of damage to the surrounding area below the dam will be unchanged. A second dam can be constructed up the river from the existing dam for $1 million. The capacity of the second dam would be more than adequate to provide the desired flood protection. If the second dam is built, redesign of the existing dam spillway will not be necessary, but the $250,000 of repairs must be done. The development in the area below the dam is expected to be completed in 10 years. A new 100-year flood in the meantime would cause a $1 million loss. After 10 years the loss would be $2 million. In addition, there would be $250,000 of spillway damage if the spillway is not redesigned. A 50year flood is also likely to cause about $200,000 of damage, but the spillway would be adequate. Similarly, a 25-year flood would cause about $50,000 of damage. There are three alternatives: (1) repair the existing dam for $250,000 but make no other alterations, (2) repair the existing dam ($250,000) and redesign the spillway to take a 100-year flood ($250,000), and (3) repair the existing dam ($250,000) and build the second dam ($1 million). Based on an expected annual cash flow analysis, and a 7% interest rate, which alternative should be selected? Draw a decision tree to clearly describe the problem.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Property Damage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
ENGR.ECONOMIC ANALYSIS
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:
9780190931919
Author:
NEWNAN
Publisher:
Oxford University Press
Principles of Economics (12th Edition)
Principles of Economics (12th Edition)
Economics
ISBN:
9780134078779
Author:
Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:
PEARSON
Engineering Economy (17th Edition)
Engineering Economy (17th Edition)
Economics
ISBN:
9780134870069
Author:
William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:
PEARSON
Principles of Economics (MindTap Course List)
Principles of Economics (MindTap Course List)
Economics
ISBN:
9781305585126
Author:
N. Gregory Mankiw
Publisher:
Cengage Learning
Managerial Economics: A Problem Solving Approach
Managerial Economics: A Problem Solving Approach
Economics
ISBN:
9781337106665
Author:
Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:
Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-…
Managerial Economics & Business Strategy (Mcgraw-…
Economics
ISBN:
9781259290619
Author:
Michael Baye, Jeff Prince
Publisher:
McGraw-Hill Education