E What will be the idle time for the LAST Workstation?
Q: Given this list of tasks, how much idle time is at station 3 if the cycle time is 15 minutes and the…
A: Project schedule helps in calculating different values related to the production cycle like the…
Q: A company must perform a maintenance project consisting of seven activities. The activities, their…
A: Forward Pass:Early Start (ES) = Max EF value from immediate Predecessor(s)Early Finish (EF)= ES +…
Q: What is Floor control and scheduling in MRP?
A: Floor control and scheduling-
Q: Given the following line balance data: Task Predecessor Time (seconds) t none 15 u t 14 v t 7 w u 6…
A: Given data, Tasks Predecessor Time t none 15 u t 14 v t 7 w u 6 x v 8 y w,x 10…
Q: time (hours) pH 7.00 7.30 6.99 7.00 Assignment 1 2 7.12 7.25 7.12 7.20 3 7.20 7.16 7.20 7.16 4 6.98…
A: Table Time (hours) PH 1 7.00 7.30 6.99 7.00 2 7.12 7.25 7.12 7.20 3…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using: Minimum no. of station = Total task time / Cycle time Cycle time =…
Q: The City Commission of Nashville has decided to build a botanical garden and picnic area in the…
A: Precedence table-
Q: Christine has three cars that must be overhauled by her ace mechanic, Megan. Given the following…
A: ANSWER : Calculate slack time for each car by subtracting remaining overhaul time from customer pick…
Q: How does the Work Breakdown Structure (WBS) assist in the cost estimation process?
A: WBS is based on the graphical illustration of the project scope that separates it into more subtle…
Q: The City Commission of Nashville has decided to build a botanical garden and picnic area in the…
A: Gantt chart Gantt chart is a visual representation of loading and scheduling process used in…
Q: What is the Latest Finish Time Rule?
A: The critical path method is an algorithmic method used to schedule project activities in a manner so…
Q: Using the line drawing tool, draw a Gantt chart for activities E through I of the proiect
A: Gantt chart is a statistical and graphical tool that can be used in project management. It is mainly…
Q: What measures can be taken to provide more capacity at a bottleneck work center?
A: Operation management in an organization aims at providing the highest efficiency possible. It…
Q: time (hours) pH 7.00 7.30 6.99 7.00 Assignment 1 2 7.12 7.25 7.12 7.20 3 720 7.16 720 7.16 4 6.98…
A: Formula:
Q: Define the work breakdown structure (WBS)? with example?
A: Work break down structure is a project execution technique that divides complex projects into…
Q: Alvis Construction Supply Company has a department that manufactures wood trusses (wood frames used…
A: The following data of the generation of trusses in Feb: Work-in-process inventory, February 1…
Q: 5.16: Complete the following table to determine the run sequence for each of the sequencing rules:…
A: Given data:
Q: 1. work flow diagram on personal accomplishments/career advancement.Please no copy paste.
A: At the point when one advances by changing careers, that individual might progress to a relevant…
Q: 6. (Ch10) Job A B C D E F Process Time (days) 2 8 4 10 5 12 Due Time (days) 7 16 4 17 15 18 Days…
A: Earliest Due Date or (EDD) - under this rule, the job which has the earliest due date is arranged…
Q: e. Compute the percent efficiency and percent idle time for the assignment in part d. Note: if the…
A: Project schedule helps in calculating different values related to the production cycle like the…
Q: A) Determine the maximum and minimum cycle times.
A: As per the guidelines we are supposed to answer one answer at a time. Please provide each question…
Q: It costs Gordon $1 to move 1 work piece 1 foot. What is the weekly total materiall handling cost of…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Schedule the following six jobs through two machines in sequence to minimize the l owtime using…
A:
Step by step
Solved in 2 steps with 1 images
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 80 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and Gare 2.8, 2.1,0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. How many minimum numbers of workstations are needed? Select one: a. None is the correct answer b. 5 C. 6 d. 3 e. 1A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 150 units per day. The product requires 7 tasks in total. These tasks are namely. A. B. C. D. E. F, and Grespectively. Task A does not have any predecessor to start. To start Task B. it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also. starting task Dneeded task B to be completed. Task E can only start upon completion of TaskC. Whereas starting task F needs the completion of both the tasks Dand E. Finally, starting task Gneeded, task F to be completed. The processing times for tasks, A. B. C, D. E. F. and Gare 2.3 2.1,0.9, 1.0, 1.2, 1.8. and 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the SECOND workstation are O a. Conly Ob None is the…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 180 units per day. The product requires 7 tasks in total. These tasks are namely, A. B, C, D, E, F, and Grespectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only startupon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A. B, C, D, E, F, and G are 2.4, 2.2, 0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first. What will be the idle time for the FIRST Workstation? O a. 0.47 O b. 0.27 Oc. 0.57 O…
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 150 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D. E. F. and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.3, 2.1, 0.9, 1.0, 1.2, 1.8, and 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first. What will be the idle time for the FOURTH Workstation? O a. 1.0 O b. 1.4 C. 0.9 O…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 180 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and Grespectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only startupon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task Fto be completed. The processing times for tasks, A, B, C, D, E, F, and Gare 2.4, 2.2,0.9, 1.0, 1.2, 1.8. are 1.5 minutes respectively. How many minimum numbers of workstations are needed? Round-up to the nearest integer O a. 8 O b. 5 Oc. None is the correct answer O d. 6 O e. 4.A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 180 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and Grespectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks Dand E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A. B, C, D, E, F, and G are 2.4, 2.2, 0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first. What will be the idle time for the FOURTH Workstation? O a. 0.57 O b. 1.67 O c. 0.47…
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 180 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and Grespectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.4, 2.2, 0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first. What is the idleness in percentage? a. 31.34 O b. 81.82 O c. None is the correct…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 tasks in total. These tasks are namely. A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task Fneeds the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. Applying the most following tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation are Select one: a. D, E,…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 80 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. What should be the (calculated) cycle time in minutes? Select one: Oa. 4.5 Ob. 0.9 Oc. None is the correct answer O d. 6.0 Oe. 4.4 Next pa nd Windows
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 90 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. How many minimum numbers of workstations are needed?A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 250 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.4, 2.2,0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. What should be the cycle time in minutes? O a. 3.20 O b. 4.80 O c. 2.67 O d. None is the correct answer O e. 2.40 O f. 1.92A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 250 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.4, 2.2, 0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. How many minimum numbers of workstations are needed? Round-up to the nearest integer a. 8 O b. None is the correct answer O c. 4 O d. 6