using johnson's rule, what is the idle time at center 2 ? job D, e, f, g center 1: 13, 23, 16, 20 center 2: 14, 13, 18, 17
Q: An S-curve is used to monitor the relationship between resource loading and time money resource…
A: In project management terms, an s-curve may be a mathematical graph that depicts relevant cumulative…
Q: TABLE 18.21 Processing Time for Eight Projects, Displayed in the Sequence They Arrived Project P1 P2…
A: Given,
Q: Question 7 Station 1 Machine A 20 min/unit Station 1 Machine B 20 min/unit Station 2 12 min/unit…
A: Process time is defined as the time taken by one unit from start to end position i e from entering…
Q: b) What is the average completion (flow) time? The average completion (flow) time is days (round…
A: a) Sequence of job according to Earliest Due Date(EDD): Job B D E A C Due Date 4 5 2 11 18
Q: hine Company is preparing a production schedule for center 27 2. The product one of the fabrication…
A: In the operation management, the Job shop scheduling problem examines scheduling jobs in a machine.…
Q: Question Complete the following table. Customer Arrival Time Service Time Finish Time Wait…
A: Customer Arrival Time Service Time 1 0 10 2 3 3 3 8 7 4 10 21 5 15 11 6 28 8
Q: What is the average flow time for the earliest due date (EDD) rule schedule?
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: what is customer churn,and why and how does a company reduce customer churn?
A: Customers can be denoted as those people who become the buyer of the product sold by a seller in…
Q: What two things must be done to control queue and meet delivery commitments?
A: Queue management approaches are used to control queues in a system.
Q: Which are the major functions of shop-floor control?
A: Shop floor control is described as the type of management that deals with the control, monitoring,…
Q: The ZU cafeteria serves on average 4000 customers a day during the lunch break (12:00-2:00pm). It…
A: Find the details below: The average number of Customers: 4000 Customers Lunch break Starts at 12:00…
Q: Explain PERSONNEL SCHEDULING IN SERVICES?
A: Employee scheduling problem arises in service industries, that have flexible employee availability…
Q: 1) What is the sample mean, sample standard deviation, minimum, and maximum of the waiting time in…
A: Given Sample mean: It is the average of a sample of observations, it is calculated by summing up…
Q: Problem 7-13 In an initial survey designed to estimate the percentage of time air-express cargo…
A: Plese find the calculation below regarding the percentage of idle time and number of observations.
Q: State the major functions of shop-floor control briefl
A: Shop floor supervision is a subset of management that is concerned with both the control,…
Q: Priority Average Arrival Rate (exponential interarrival times) High 3 per hour Low 5 per hour…
A: Find the Calculation methods below: Probability of no customers in the system: ρ0 = 1[∑n = 0n =…
Q: If the restaurant runs a sale and the customer arrival rate increases by 20%, how would this change…
A:
Q: JOB ABCDE E HENCE) 36 14 16 6 26 REQUIRED) 14 7260 10 ding to EDD. the sequence of jobs should be D,…
A:
Q: uestion 24 Copy of Table 10.10 A work center has the following five jobs waiting to be processed…
A: FCFS represents First Come First Serve. In the FCFS booking calculation, the work that showed up…
Q: ve customers brought in computers to be repaired to a small shop. Estimated repair times (in days)…
A: Early Due Date (EDD) is a scheduling rule that is used by the organization to sequence jobs in…
Q: Leo manages a receiving station for rice. Farmers deliver their loads of rice with a rate of 150…
A: The seasonal workers would start the work at 10 AM, the first 4 hours would be accumulated as shown…
Q: state whether or not each situation would be considered “compensable time” (and why or why not).…
A: The concept of "compensable time" plays a crucial role in the realm of labor law and employee…
Q: 2. expected weekly demand. The staff requirements have been determined to be: JA small restaurant is…
A: wait staffs are needed and the final schedule is listed in the table below: Mon Tue Wed Thu…
Q: Question 2: Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical…
A: The detailed solution to this question is given in Step 2.
Q: QUESTION #4 Four delivery trucks are in a queue at a Tool Company with only one service bay. The…
A: Given data is
Q: The following 5 overhaul jobs are waiting to be processed at Avianic's Engine Repair Inc. These jobs…
A: Given data; Today's day 200 Critical ratio = Time until due date Total shop time…
Q: How could you integrate output control intro a college classroom to maximize student learning?
A: Output control focuses on measurable results within an organization. An Examples include the number…
Q: Eat well is a small drive through fast food restaurant, staffed by an efficient employee John, is…
A: The concept of queuing theory is used here with M/M/1 queuing model.
Q: The processing times of four jobs are given as follows: Job Processing time (minutes) A 10 B…
A: Find the Given details below: Given details: Patient Processing time(min) A 10 B 30 C 16…
Q: b. What is the longest wait time experienced by a customer?
A: According to a survey conducted, a customer is willing to wait for at least 14 minutes before being…
Q: Which option (a, b, c, or d) shows the correct objective function and constraints for this…
A: Linear programming is a mathematical optimization technique for determining an optimal solution to a…
Q: In what sequence will the jobs be completed if the DDATE rule is used? Group of answer choices a)…
A: Note: as per guidelines we are only allowed to solve one question at a time.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 2 images
- I still don't know how to get a finish time and wait time. Question Complete the following table. Customer Arrival Time Service Time Finish Time Wait Time 1 0 10 2 3 3 3 8 7 4 10 21 5 15 11 6 28 8 Assume there are two queues, what is the average waiting time?1Short question 4- Leo manages a receiving station for rice. Farmers deliver their loads of rice with a rate of 150 tons per hour from 6:00 am to 2:00 pm. Leo can process them at a rate of 100 tons an hour. The station has room to hold only 200 tons of rice in inventory prior to processing. Once this space is filled, the farmers’ trucks must wait to dump their contents. Leo is considering using seasonal workers to help him with the processing of rice loads. When the seasonal workers are working, the processing rate increases to 125 tons per hour. The seasonal workers would start working at 10:00 am and finish working when the trucks stop waiting. At what time, Leo will finish processing loads of rice using these seasonal workers?
- What is the answerA Maving to another question will sae this response. Question 24 Copy of Table 10.10 A work center has the following five jobs waiting to be processed (all times are shown in days): Job Arrival Processing Due 12 29 16 11 31 13 12 25 1 8 Use the infomation in Table 10.10. What is the average flow time using the FCFS rule (Answer to 2 decimal places)? (CSLOS 1,2,3) Moving to another question will save this response.Question 52 An S-curve is used to monitor the relationship between resource loading and O time O money O resource availability O project progress A Moving to another question will save this response. amazon ch BCe cer
- Text Book Question 4C-12 Please answer the question fully and do not use CHAT GPT. I will report if I am not given honest help. I am struggling with these questions and am in need to get the best help to prepare for my final. So please be wise and do honest work in helping me. Thanks! - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Given the table (see picture) If the indirect cost savings is $1,300,000 per week a) Draw the network diagram b) What is the critical path?c) Provide the steps and process to crash this project d) What is the maximum time that this project can be crashed, what is the total crashing cost, and what is the new duration? e) Provide the final network diagram (using the maximum crash time)Priority Average Arrival Rate (exponential interarrival times) High 3 per hour Low 5 per hour Number of servers: 5 Service rate: 2 per hour (exponential service times) What is the average time in line (in minutes) for a high priority item? Question 8 options: 2 5 24 35 54Problem 7-13 In an initial survey designed to estimate the percentage of time air-express cargo loaders are idle, an analyst found that loaders were idle in 5 of the 45 observations. a. What is the estimated percentage of idle time? (Round your answer to 2 decimal places. Omit the "%" sign in your response.) Estimated percentage of idle time % b. Based on the initial results, approximately how many observations would you require to estimate the actual percentage of idle time to within 4 percent with a confidence of 95 percent? (Round your z value to 2 decimal places. Do not round any other Intermediate calculations. Round UP your final answer to the next whole number.) Number of observations
- Q2. In Aegis life insurance company, the deposit and withdrawal functions associated with cer- tain investment product are separated by two clerks, Stack and Slack. Deposit slips arrive at Stack’s desk according to a Poisson process with a mean rate of 16 per hour. Withdrawal slips arrive at Slack’s desk according to a Poisson process with a mean rate of 14 per hour. The time required to process either transaction has an exponential distribution with a mean of 3 minutes. Based on this information, answer the following questions: (a) In the current situation, what model will you apply for analysis of queuing system at Stack’s desk and Slack’s desk? Answer this question by filling the following table. Model λ µ ρ Reaches steady state? Stack's Desk - - - - - Slack's Desk - - - - - (b) What is the expected waiting time of a deposit slip at Stack’s desk? What is the expected waiting time of a withdrawal slip at Slack’s desk? Suppose “the system” contains both Stack and…Determine if FCFS, SLACK or SPT are better options for sequencing work through the shopKelson Sporting Equipment Inc need part D and E answered D. how many hours of production time will be scheduled in each department? E. what is the slack time in each department?