During the construction of a house, six joists of 24 ft each must be trimmed to the correct length of 23 ft. The operations for cutting a joist involve the following sequence: Operation 1. Place joist on saw horses 2. Measure correct length (23 ft) 3. Mark cutting line for circular saw 4. Trim joist to correct length 5. Stack trimmed joist in a designated area Time (seconds) 15 5 5 20 20 Three persons are involved: Two loaders must work simultaneously on operations 1, 2, and 5, and one cutter handles operations 3 and 4. There are two pairs of saw horses on whi untrimmed joists are placed in preparation for cutting, and each pair can hold up to three side-by-side joists. Suggest a good schedule for trimming the six joists.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
5. During the construction of a house, six joists of 24 ft each must be trimmed to the correct
length of 23 ft. The operations for cutting a joist involve the following sequence:
Operation
1. Place joist on saw horses
2. Measure correct length (23 ft)
3. Mark cutting line for circular saw
4. Trim joist to correct length
5. Stack trimmed joist in a designated area
Time (seconds)
15
5
5
20
20
Three persons are involved: Two loaders must work simultaneously on operations 1,2,
and 5, and one cutter handles operations 3 and 4. There are two pairs of saw horses on
which untrimmed joists are placed in preparation for cutting, and each pair can hold up
to three side-by-side joists. Suggest a good schedule for trimming the six joists.
Transcribed Image Text:5. During the construction of a house, six joists of 24 ft each must be trimmed to the correct length of 23 ft. The operations for cutting a joist involve the following sequence: Operation 1. Place joist on saw horses 2. Measure correct length (23 ft) 3. Mark cutting line for circular saw 4. Trim joist to correct length 5. Stack trimmed joist in a designated area Time (seconds) 15 5 5 20 20 Three persons are involved: Two loaders must work simultaneously on operations 1,2, and 5, and one cutter handles operations 3 and 4. There are two pairs of saw horses on which untrimmed joists are placed in preparation for cutting, and each pair can hold up to three side-by-side joists. Suggest a good schedule for trimming the six joists.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.