Consider a Design-and-Build project of a single-entrance toll plaza awarded to XYZConstruction Corp. Based on the traffic surveys conducted during planning phase, it was found out that the present travel demandalong the existing highway isfollows a negative exponential distributionwith a mean of 4XYZkph. On the other hand, the company received three bid proposals of equipment that they may install in the toll servers with their corresponding service rates: Equipment I(random service)0.7Xseconds per vehicleEquipment II(random service)0.5+Y/100seconds per vehicleEquipment III(regular service)0.8Zseconds per vehicleIn addition, the demand is projected to increase annually by a factor of 1.3Z. If you are the transport planner tasked to design the toll facility, determine the following5years hence: i.The average waiting time of vehicles if Equipment Iwill be installed. ii.The average time spent in the system if Equipment IIIwill be installed. iii.What equipmentwould you recommend as the most efficient (most efficient pertains to the least time a vehicle spends in the system. Hint: solve theparameter,?̅for each equipment that relates to efficiency

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Consider a Design-and-Build project of a single-entrance toll plaza awarded to XYZConstruction Corp. Based on the traffic surveys conducted during planning phase, it was found out that the present travel demandalong the existing highway isfollows a negative exponential distributionwith a mean of 4XYZkph. On the other hand, the company received three bid proposals of equipment that they may install in the toll servers with their corresponding service rates:

Equipment I(random service)0.7Xseconds per vehicleEquipment II(random service)0.5+Y/100seconds per vehicleEquipment III(regular service)0.8Zseconds per vehicleIn addition, the demand is projected to increase annually by a factor of 1.3Z. If you are the transport planner tasked to design the toll facility, determine the following5years hence:

i.The average waiting time of vehicles if Equipment Iwill be installed.
ii.The average time spent in the system if Equipment IIIwill be installed.
iii.What equipmentwould you recommend as the most efficient (most efficient pertains to the least time a vehicle spends in the system. Hint: solve theparameter,?̅for each equipment that relates to efficiency

Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Taxable income
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning