computer manufacturing assembly line the manager said that he wanted to produce 50 computers per hour for this desired output. What is the cycle time?
Q: what is finding the bottlenecks in the process?
A: A process bottleneck can be defined as a stage in the work which gets more requests related to work…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: Consider a process consisting of three resources. Assume there exists unlimited demandfor the…
A: Note- We’ll answer the first three subparts of the question since the exact one wasn’t specified.…
Q: 14. A production line is to be designed to assemble a product. The assembly of this product requires…
A: Given data is Task time of first task = 0.3 mins Task time of second task = 1.4 mins Task time of…
Q: 1. A company is designing a product layout for a new product. They plan to use this production line…
A: Cycle time is the actual time spent on the production of an item by the team members.
Q: PS.55 Four Corners is an IBC company that sells delicious Navajo tacos in the Crossroads Food Court.…
A: Given, Option 1 : Fixed cost = $180 Variable cost = $0.24 Option 2 : Fixed cost = $365 Variable…
Q: What are the impacts of flow production method to cost reduction?
A: Flow production is also referred to as continuous production. As per this production method, a…
Q: The three-station work cell illustrated in the figure below has a product that must go through one…
A: It is important to identify the bottleneck since it allows focusing on the improvement of those…
Q: SITUATION: A company is about to begin production of a new product. The manager of the department…
A: Run Size A fixed amount of output that minimizes the overall annual expense of setting up and…
Q: a. How long does it take the average customer to complete this process? b. What single activity is…
A: Operation management is performed in each manufacturing organization. It all deals with the…
Q: How does the capacity analysis react when many processes are running concurrently
A: Capacity analysis can be defined as the way of knowing the capacity of the organization which…
Q: The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4.…
A: a)The capacity of a process is calculated by the bottleneck process capacity. It is the process in a…
Q: Mamar daan halim is one of the best halim in Bangladesh. They have a food stand in Banasree. Mama…
A: Quality is one of the most important factor which helps a firm is retaining market share and brand…
Q: Mega Corp. is designing a product layout for a new electronic product. They plan to use this…
A: Any electrical equipment, appliance, material, system, or apparatus that conveys or is controlled by…
Q: What cycle time is required to satisfy the required output? What is the theoretical minimum number…
A: Given: Time available = 1 hr = 60 mins Desired output = 90 units
Q: Explain the machine-scheduling problem?
A: The essential type of the issue of scheduling jobs with multiple (M) tasks, over M machines, to such…
Q: How do bottlenecks increase the work in process inventory of manufacturing plants?
A: In the manufacturing phase, a bottleneck refers to a point of congestion or impediment in the…
Q: Use the EDD rule and compute the start time, flow time, lateness, and tardiness for each job. Use…
A: In project management, job sequencing refers to the logical arrangement of project tasks to ensure…
Q: a. what is the bottleneck of this process? b. what is the hourly capacity of the process?
A: Bottleneck station refers to the the one which has the lowest output per unit time. The output at…
Q: 9-6. What cycle time would match capacity and demand if demand is 120 units a day, there are two…
A: Given Data:Daily demand:Two shifts of Workers have three half-hour breaks during each shift, one of…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: Find the value of X in the following Flow Shop data consisting of 5 jobs which are to be processed…
A: Johnson's Rule is a sequencing method that can be applicable in scheduling into two workstations.…
Q: To meet holiday demand, Alex's Pie Shop requires a production line that is capable of producing 50…
A: Cycle time is the proportion between total available time and total demand. Considering the given…
Q: Based on the data from the below table: b. What is the system capacity in the total number of car…
A: Bottleneck process is an activity in a process which reduces the total capacity of the process. The…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Total Working hours=8 hour or 480 minutes Total Task =7 task Daily Demand= 120 toys Total task time…
Q: To meet holiday demand, Penny’s Pie Shop requires a pro-duction line that is capable of producing 50…
A: Given Information: The capacity of the shop = 50 pecan pies per week Operation hours = 40 hours per…
Q: Problem 5-17 (Static) The following diagram describes a process that consists of eight separate…
A: Process capacity refers to the maximum output that a process can deliver within the stipulated time.…
Q: TB Problem Qu. 5-114 (Algo) Mccabe Corporation uses the weighted-average... Mccabe Corporation uses…
A: The above-given question is to ascertain the Equivalent units of production. Equivalent units of…
Q: Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials…
A: Required 6 Cost of units transferred to finished goods : 301,279 7 The cost of spoilage charged to…
Q: h ow do production plants handle maintenance and repair activities to minimize downtime?
A: In manufacturing, a production plant is essential because it transforms raw ingredients into…
Q: QRS Corp is designing a product layout for a new product. They plan to use this production line 9…
A: Cycle time is the time that is spent on the working of production of an item by the workers in an…
Q: PS.55 Four Corners is an IBC company that sells delicious Navajo tacos in the Crossroads Food Court.…
A: Given- For Option 1 (medium automation):Fixed Cost = $190Variable cost = $0.23 per fry breadFor…
Q: Marine Parts Inc. wants to produce parts in batches of 60 parts. Each part must be processed…
A: Batch Processing:Batch processing refers to the execution of a series of tasks or jobs as a group,…
Q: The University Medical Center is medium-sized, 300-bed capacity hospital at Dasmarinas Cavites. The…
A: EMPLOYEE LAYOFF: This is the process of terminating the employees on a temporary or permanent basis…
n a computer manufacturing assembly line the manager said that he wanted to produce 50 computers per hour for this desired output. What is the cycle time?
Step by step
Solved in 2 steps
- PvnTo meet holiday demand, Alex's Pie Shop requires a production line that is capable of producing 50 pecan pies per week, while operating only 40 hours per week. There are only four steps required to produce a single pecan pie with respective processing times of 5 minutes, 5 minutes, 45 minutes, and 15 minutes. a. What should be the line's cycle time? b. What is the smallest number of workstations Alex could hope for in designing the line considering this cycle time? c. Suppose that Alex finds a solution that requires only four stations. What would be the efficiency of this line?Employees Layoffs at the University Medical Center The University Medical Center is medium-sized, 300-bed capacity hospital at Dasmarinas Cavites. The facilities have grown gradually over the years and are now the 2nd largest in the town of Dasmarinas. It is entirely nonunion and has never experienced an employee layoff since its inception. Sister Veronica Cornista, the Chief Executive Officer of the hospital for 8 years presented a rather bleak financial of the BOD. This according to her is the result of the declining occupancy rate which has affected the hospital’s revenues to such an extent that it ran a deficit for the first time last 1998. Such declines have not been unusual for this industry because of increasing competition. So far, the only response to these changes has been tightening of requirements for equipment or supply purchases. The projected deficit for the coming year is around 1,300,000 unless some additional revenues were identified or some additional savings…
- QRS Corp is designing a product layout for a new product. They plan to use this production line 9 hours a day in order to meet forecasted demand of 600 units per day. Calculate the cycle time in seconds.. Calculate the minimum number of work stations if the sum of the task times is 170 secs Edit Format Table 12pt v Paragraph v BI UAV MacBook Air 80 esc F3 F5 F6 F7 FB F9 F1 F2 F4 @ # $ & 2 3 7 8 W R IIIY この COManufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?h ow do production plants handle maintenance and repair activities to minimize downtime?
- 9Problem 5-17 (Static) The following diagram describes a process that consists of eight separate operations, with sequential relationships and capacities (units per hour) as shown. 15/hr 5/hr 10/hr Capacity 8/hr 20/hr 12/hr a. What is the current capacity of the entire process? units per hour Operation to improve How much additional capacity to strive for Resulting capacity of the process Check my work 34/hr b. If you could increase the capacity of only one operation through process improvement efforts, which operation would you select, how much additional capacity would you strive for, and what would the resulting capacity of the process be? 30/hr units per hour units per hour14. A production line is to be designed to assemble a product. The assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete , and one of which requires 0.7 minutes to complete. If this production line has three workstations and a cycle time of 1.5 minutes , what is its efficiency ?
- Please don't provide handwritten solution ....How do bottlenecks increase the work in process inventory of manufacturing plants?Based on the data from the below table: b. What is the system capacity in the total number of car arrivals per hour? Which resource(s) is (are) the bottleneck(s)? System Capacity: Bottleneck: Resources and task times are as follows: Service Oil & filter change Transmission fluid check Tire rotation Wheel balancing Number of employees 2 1 2 2 Time required/employee 12 minutes 5 minutes 15 minutes 30 minutes