A quality control engineer studied the relationship between years of experience as a system control engineer and the capacity of the engineer to complete within a given time a complex control design including the debugging of all computer programs and control devices. A group of 25 engineers having widely differing amounts of experience (measured in months of experience) was given the same control design project. The results of the study are given in the following table with y 5 1 if the project was successfully completed in the allocated time and y 5 0 if the project was not successfully completed. a. Determine whether experience is associated with the probability of completing the task.
A quality control engineer studied the relationship between years of experience as
a system control engineer and the capacity of the engineer to complete within a given time a
complex control design including the debugging of all computer programs and control devices.
A group of 25 engineers having widely differing amounts of experience (measured in months of
experience) was given the same control design project. The results of the study are given in the
following table with y 5 1 if the project was successfully completed in the allocated time and
y 5 0 if the project was not successfully completed.
a. Determine whether experience is associated with the
the task.
b. Compute the probability of successfully completing the task for an engineer having
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images
- Compute the
probability of successfully completing the task for an engineer having 24 months of experience. Place a 95% confidence interval on your estimate.