Table 1 No Area Туре Path Length Slope |(acres) 1 24 Grass, Fair Condition AE (ft) (%) 1600 4 2 15 Rangeland - Natural BF 1490 3 3 16 Asphalt 4 12 Concrete DF 1250 2 CE 1280 2 EF 1300 1.5 FG 1510 1.5 An urban watershed in Jefferson County is shown in Figure 1 below, along with the travel paths from the most remote points in each subarea. The details of the subareas are given in Table 1 below. Determine the 50 year peak flow for the drainage outlet G. Use the IDF chart for Jefferson County that is shown below. Use the NRCS Method (TR55) to determine time of concentration and estimate runoff coefficients using Table 15.2.3 (provided in Lesson Notes). Figure 1 Table 1 No Area (acres) Туре Path Length Slope (ft) (%) 1 24 Grass, Fair Condition AE 1600 4 2 15 Rangeland - Natural BF 1490 3 B G

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 9P
icon
Related questions
Question
Table 1
No Area
Туре
Path Length Slope
|(acres)
1 24 Grass, Fair Condition AE
(ft) (%)
1600 4
2
15 Rangeland - Natural BF
1490
3
3
16
Asphalt
4 12 Concrete
DF 1250 2
CE 1280 2
EF 1300
1.5
FG 1510
1.5
Transcribed Image Text:Table 1 No Area Туре Path Length Slope |(acres) 1 24 Grass, Fair Condition AE (ft) (%) 1600 4 2 15 Rangeland - Natural BF 1490 3 3 16 Asphalt 4 12 Concrete DF 1250 2 CE 1280 2 EF 1300 1.5 FG 1510 1.5
An urban watershed in Jefferson County is shown in Figure 1 below, along with the travel paths from the
most remote points in each subarea. The details of the subareas are given in Table 1 below. Determine
the 50 year peak flow for the drainage outlet G. Use the IDF chart for Jefferson County that is shown
below. Use the NRCS Method (TR55) to determine time of concentration and estimate runoff coefficients
using Table 15.2.3 (provided in Lesson Notes).
Figure 1
Table 1
No Area
(acres)
Туре
Path Length Slope
(ft) (%)
1
24 Grass, Fair Condition AE
1600 4
2
15
Rangeland - Natural BF
1490 3
B
G
Transcribed Image Text:An urban watershed in Jefferson County is shown in Figure 1 below, along with the travel paths from the most remote points in each subarea. The details of the subareas are given in Table 1 below. Determine the 50 year peak flow for the drainage outlet G. Use the IDF chart for Jefferson County that is shown below. Use the NRCS Method (TR55) to determine time of concentration and estimate runoff coefficients using Table 15.2.3 (provided in Lesson Notes). Figure 1 Table 1 No Area (acres) Туре Path Length Slope (ft) (%) 1 24 Grass, Fair Condition AE 1600 4 2 15 Rangeland - Natural BF 1490 3 B G
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning