An excavation of 25,750 m3 (bm) is to be made for the foundation excavation of a building in 5 weeks assuming 6 workdays per week and 8 hours working time per day. It is expected that during excavation 5.0 workdays will be lost due to bad weather conditions. The excavation will be done in dry earth with an average depth of cut of 3,25 meter. Angle of swing is about 90°. Estimated working time in an hour is about 51 minutes. Determine the minimum size of the backhoe if only one backhoe will be used?
An excavation of 25,750 m3 (bm) is to be made for the foundation excavation of a building in 5 weeks assuming 6 workdays per week and 8 hours working time per day. It is expected that during excavation 5.0 workdays will be lost due to bad weather conditions. The excavation will be done in dry earth with an average depth of cut of 3,25 meter. Angle of swing is about 90°. Estimated working time in an hour is about 51 minutes. Determine the minimum size of the backhoe if only one backhoe will be used?
Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter19: Braced Cuts
Section: Chapter Questions
Problem 19.7P
Related questions
Question
![An excavation of 25,750 m3 (bm) is to be made for the foundation excavation of a building in 5 weeks assuming 6
workdays per week and 8 hours working time per day. It is expected that during excavation 5.0 workdays will be lost
due to bad weather conditions. The excavation will be done in dry earth with an average depth of cut of 3,25 meter.
Angle of swing is about 90°. Estimated working time in an hour is about 51 minutes.
Determine the minimum size of the backhoe if only one backhoe will be used?
O 1.25 cu yd
O 1.00 cu yd
2.00 cu yd
O 1.50 cu yd
O 1.75 cu yd](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fe759138b-7e82-43b1-b7de-92e76564e6de%2F206446f2-7dd3-4c30-a8a0-dda499d01f09%2Fab572cv_processed.png&w=3840&q=75)
Transcribed Image Text:An excavation of 25,750 m3 (bm) is to be made for the foundation excavation of a building in 5 weeks assuming 6
workdays per week and 8 hours working time per day. It is expected that during excavation 5.0 workdays will be lost
due to bad weather conditions. The excavation will be done in dry earth with an average depth of cut of 3,25 meter.
Angle of swing is about 90°. Estimated working time in an hour is about 51 minutes.
Determine the minimum size of the backhoe if only one backhoe will be used?
O 1.25 cu yd
O 1.00 cu yd
2.00 cu yd
O 1.50 cu yd
O 1.75 cu yd
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning