Given: A small hydraulic excavator will be used to dig a trench in common earth (bucket fill factor = 0.95). The minimum trench size is 0.6 m wide by 2.5 m deep. The excavator bucket available is 0.75 m wide and has a heaped capacity of 0.60 m³. The maximum digging depth of the excavator is 5.0 m. The average swing angle is expected to be 90°. Use the average value for trench production adjustment factor in Table 5. Required: Estimate the hourly trench production in linear meters if job efficiency is 70%. Hint: Start by determining the bank volume per meter of trench that would be excavated.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Table 5. Adjustment factor for trench production
Type of Material
Adjustment Factor
Loose (sand, gravel, loam)
0.60-0.70
Average (common earth)
0.90-0.95
Firm (firm plastic soils)
0.95-1.00
Transcribed Image Text:Table 5. Adjustment factor for trench production Type of Material Adjustment Factor Loose (sand, gravel, loam) 0.60-0.70 Average (common earth) 0.90-0.95 Firm (firm plastic soils) 0.95-1.00
Given:
A small hydraulic excavator will be used to dig a trench in common earth (bucket fill
factor = 0.95). The minimum trench size is 0.6 m wide by 2.5 m deep. The excavator
bucket available is 0.75 m wide and has a heaped capacity of 0.60 m³. The maximum
digging depth of the excavator is 5.0 m. The average swing angle is expected to be
90°. Use the average value for trench production adjustment factor in Table 5.
Required:
Estimate the hourly trench production in linear meters if job efficiency is 70%.
Hint: Start by determining the bank volume per meter of trench that would be
excavated.
Transcribed Image Text:Given: A small hydraulic excavator will be used to dig a trench in common earth (bucket fill factor = 0.95). The minimum trench size is 0.6 m wide by 2.5 m deep. The excavator bucket available is 0.75 m wide and has a heaped capacity of 0.60 m³. The maximum digging depth of the excavator is 5.0 m. The average swing angle is expected to be 90°. Use the average value for trench production adjustment factor in Table 5. Required: Estimate the hourly trench production in linear meters if job efficiency is 70%. Hint: Start by determining the bank volume per meter of trench that would be excavated.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning