Although the problems say solve graphically, please solve all problems using the QM for Windows software or solve manually. B.5 The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are zvailable and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each heater assembled may be sold for a $15 profit. Formulate and solve this LP production-mix situation, and find the best combination of air conditioners and heaters that yields the highest profit.
Although the problems say solve graphically, please solve all problems using the QM for Windows software or solve manually.
B.5
The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are zvailable and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each heater assembled may be sold for a $15 profit.
Formulate and solve this LP production-mix situation, and find the best combination of air conditioners and heaters that yields the highest profit.
Step by step
Solved in 1 steps