Enter the latest finish time (LF) for each activity in the table below: Format: No decimal points, write only integers. Activity Latest Finish 1 2 3 4 5 6 7 8 9 10 11 12 Activity Predecessors 1 Description Duration Start job 1 2 1 Relocate electric 6 3 1 4 3 5 4 6 4 7 5,6 Excavate Install pipe section #1 10 Backfill section #1 Install pipe section #2 Backfill section #2 8 6 Test pipe sections 9 7,8 10 2,8 Grade and sod Install manhole 5652837 12 11 10 Test relocated electric 32 12 9.11 Final inspection 1 Of the following images which is the correct Activity on Node (AON) rendering of this project? (Keep in mind that within each box the top number is the activity and the bottom number is the duration)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Enter the latest finish time (LF) for each activity in the table below:
Format: No decimal points, write only integers.
Activity
Latest Finish
1
2
3
4
5
6
7
8
9
10
11
12
Transcribed Image Text:Enter the latest finish time (LF) for each activity in the table below: Format: No decimal points, write only integers. Activity Latest Finish 1 2 3 4 5 6 7 8 9 10 11 12
Activity Predecessors
1
Description
Duration
Start job
1
2
1
Relocate electric
6
3
1
4
3
5
4
6
4
7
5,6
Excavate
Install pipe section #1 10
Backfill section #1
Install pipe section #2
Backfill section #2
8
6
Test pipe sections
9
7,8
10
2,8
Grade and sod
Install manhole
5652837
12
11
10
Test relocated electric
32
12
9.11
Final inspection
1
Of the following images which is the correct Activity on Node (AON) rendering of this project?
(Keep in mind that within each box the top number is the activity and the bottom number is the
duration)
Transcribed Image Text:Activity Predecessors 1 Description Duration Start job 1 2 1 Relocate electric 6 3 1 4 3 5 4 6 4 7 5,6 Excavate Install pipe section #1 10 Backfill section #1 Install pipe section #2 Backfill section #2 8 6 Test pipe sections 9 7,8 10 2,8 Grade and sod Install manhole 5652837 12 11 10 Test relocated electric 32 12 9.11 Final inspection 1 Of the following images which is the correct Activity on Node (AON) rendering of this project? (Keep in mind that within each box the top number is the activity and the bottom number is the duration)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 1 steps

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.