A work system has five stages with processing times of 58, 247, 91, 262, and 175 mins/unit. A product must go through these stages in a sequential order. What is the bottleneck processing time in mins/unit? (Only enter a number, do not enter any units
Q: While setting the cycle time as the maximum possible will result in more out Oa. FALSE O b. TRUE
A: The cycle time is the length of time it takes to execute a task from beginning to end. It's the time…
Q: You observe a vehicle registration department at your local township. Assume that allemployees are…
A: It is given that the employees are ready to work. Hence, the average flow time from others would be…
Q: . Consider a four-step serial process with processing times given in the following list.There is one…
A: Arrangement : The pace of framework is characterized by machine with biggest time per unit for…
Q: A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling…
A: A production process at Kenneth Day Manufacturing is shown in the figure above. Effective capacity…
Q: . how to minimize tardiness of the 8 jobs? 2. Find a sequence to minimize the number of tardy jobs…
A: Sequencing is that the choice of associate acceptable order within which range of jobs (Operations)…
Q: Joe's Twenty-four Seven Laundromat has the following jobs waiting to be processed. The first step of…
A: The sequence of operation is given as First Come First Serve i.e. A-B-C-D-E. Here, the 1st operation…
Q: The maximum cycle time is the sum of all task times when the tasks are running in series. a. TRUE b…
A: “Cycle time” is a vague term that may apply to a wide range of things depending on the context. The…
Q: Consider the following process at a pharmacy. Customers drop off their prescriptions either in the…
A: 1. The possible outcomes of this process are - a. Decrease in cost of acquisition of the patients…
Q: A firm uses a serial assembly system and needs answers to the following: An output of 900 units…
A: Given: Desired output = 900 units time = 7.5 hours work content at each station = 30 seconds
Q: Explain briefly five (5) important process scheduling policy factors that must be considered.
A: ANSWER: Planning of schedule Management : The planning for schedule management which outlay the…
Q: 18Every company has a Bottleneck True False 19Capacity of each sequence in a process is independent…
A: The detailed solution is given in Step ahead.
Q: You observe a bank and notice that a customer leaves the bank about every five minutes.These five…
A: Cycle Time is the time taken by an individual unit under the process. Cycle time can always be…
Q: Use Johnson's Rule to sequence the following set of five jobs that require first a shearing…
A: Given data
Q: The objective of line balancing is to assign tasks to workstations in such a way that the…
A: Line balancing refers to assigning the right number of workers and machines to every assembly line…
Q: Technology has had a great effect on our ability
A: At the point when a huge number of individuals in the United States and all throughout the planet…
Q: In a manufacturing system, the technique of deciding how to assign work to specific work stations…
A: b. Line balancing
Q: Supervisor Tom Choi at Tempe Equipment Company is concerned that material is not arriving as…
A: Delay Factor - The delay factor specifies how much of the buffer must be used at the next node…
Q: Approximately how much time (in minutes) does the workers spend fixing the Fab Tech equipment during…
A: Note: "Since you have asked multiple questions, we will solve the first question for you. If you…
Q: An independent accountant is planning to prepare tax returns for six of her clients.Prior to her…
A: Step 1: Initially, the minimum number should be selected by considering both the columns. Here, 0.5…
Q: The students information like Name, GPA, Major subjects etc., about a particular is stored in the…
A: A) Student Record:- An understudy/student record is one that: Is kept up by the University or…
Q: If a flow unit type j does not consume any time at a resource i, the corresponding cell inthe…
A: The corresponding cell of the type j cell in the workload matrix, which is referred as WL (i, j)…
Q: Mr. X is the supervisor for a dry cement packaging company. His work crew is composed of unskilled…
A: The internal control comprises of the policies and procedures that are in place to make sure the…
Q: The objective of line balancing is to assign tasks to different workstations such that the…
A: The principle objective of line adjusting is to circulate the assignment uniformly absurd station so…
Q: What are the tarde offs in Deciding how often update standard times due to minor changes in the work…
A: A trade-off is a kind of compromise that involves giving up something in return for getting…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Daily Working hour= 8 hours Daily Demand = 90 units Sum of total task time =…
Q: Given a set ?? = {??1,??2, … ,????} of tasks, where ???? requires ???? units of processing time to…
A: question 1:the goal of attaning minimum waiting time will come when we select shortest job and…
Q: You are registering your child for kindergarten. You must do this in person on a specific date and…
A:
Q: d) Using the LPT (longest processing time) decision rule for sequencing the jobs, the order is (to…
A: LPT rule: Sequence Job 1 E 2 D 3 C 4 A 5 B
Q: The process for renewing a driver's license at the Archer County Courthouse is as follows. First,…
A: Utilization is the proportion between actual usable time and available production times. Here, we…
Q: Customers drop off their prescriptions either in the drive-through counter or in the front counter…
A: The process involved in the process above is order to cash. Order to cash is a business process that…
Q: The following jobs are waiting to be processed at Jeremy LaMontagne's machine center. Today is day…
A:
Q: The maximum cycle time is the time of the longest task when the tasks are running in parallel. O a…
A: Answe is option (a)
Q: Why is it important to view a batch-process operation as a network of interconnected queues?
A: Batch process operation is a type of operation in which a fixed no. inputs are loaded into the…
Q: Suppose there is a set of jobs to be processed at a resource. Shortest processing timealways…
A: False. Shortest processing time sequencing need not be quite the same as FCFS sequencing. In…
Q: A total of 40 customers/ hour frequent Chris'. What is the implied utilization at the espresso…
A: Below is the solution:-
Q: Work-in-process inventories are raw materials and supplies waiting to be processed.; True or False
A: Manufacturing is the process of conversion of raw materials into final goods after carrying out…
Q: An architect has five projects to complete. She estimates that three of the projects willrequire one…
A: Compute the time required to complete the project: Time required to complete=1+1+1+3+4=10
Q: hree jobs are in the queue. The number of tickets each has and the number of seconds of processing…
A:
Q: This is when a job is increased vertically or horizontally.
A: Job Enrichment is a management concept to motivate the employees by redesigning their jobs to…
Q: The earliest-due-date rule always minimizes the maximum tardiness across jobs. True orfalse?a.…
A: The right option is A. True, the earliest-due-date rule always minimizes the maximum tardiness…
Q: This refers to the type of jobs that needs to be filled
A: It is important for an organisation to fill the jobs which are vacant. The details are discussed as…
Q: machines (A, B, and C) in the same order. The processing times are listed below. Use Johnson's Rule…
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: The maximum cycle is the sum of all task times when the tasks are running in series: True or False…
A: The cycle time can be defined as "the time taken to complete the production of one unit from start…
Q: The bottleneck resource in a process has the least idle time. True or false?a. Trueb. False
A: The bottleneck resource in a process has the least idle time.
Q: Consider the following process at a pharmacy. Customers drop off their prescriptions either in the…
A: As per the case, there are some issues that are recoginsed that would be require to changes like-…
Q: The objective of line balancing is to assign tasks to workstations in such a way that the…
A: Production is the process of manufacturing products for consumption purposes to sell in the market.…
Q: The process for renewing a driver's license at the Archer County Courthouse is as follows. First,…
A: The utilization rate is defined as the percentage of an individual's entire working hours that are…
Q: Fiona cleans offices. She is allowed 5 seconds per square foot. She cleans building A, which is…
A: THE ANSWER IS AS BELOW:
Q: Which statement is correct? O a. There could be more than one critical path in a network of…
A: Even if each task is important, just a few are critical. The critical route is a set of…
A work system has five stages with processing times of 58, 247, 91, 262, and 175 mins/unit. A product must go through these stages in a sequential order. What is the bottleneck processing time in mins/unit? (Only enter a number, do not enter any units
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- A work system has five serial stations that have process times of 5, 9, 4, 9, and 8. To complete processing, a unit needs to go through all stations. What is the process cycle time of the system?Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami Cut bread 0.75 minutes 0.75 minutes 0.75 minutes Grill 1.4 minutes 1.4 minutes Slice meat 3 minutes Toast 2 minutes 2 minutes 2 minutes Wrap 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no mattor which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. (a) What is the implied utilization of each of the five steps in this process? 62.5 % 93.3 % 50.이% 83.3 % 41.7 % Cut Grill Slice Toast Wrap (b) What is the actual and maximum flow rates of the three sandwich types? per hour Veg Chicken per hour67. The number of resources requested by a process : a. must always be less than the total number of resources available in the system b. must always be equal to the total number of resources available in the system c. must not exceed the total number of resources available in the system d. must exceed the total number of resources available in the system
- Joe's Twenty-four Seven Laundromat has the following jobs waiting to be processed. The first step of the process includes washing and drying the clothes; the second step is pressing the clothing. Joe wants to minimize the amount of time it takes to do all the jobs. The five jobs waiting to be processed are shown here. Job Wash andDry (hours) Press(hours) A 5 4 B 3 4 C 2 3 D 7 5 E 4 2 Wash and Dry Using FCFS, assume the jobs arrive in the order shown (A, then B, then C, etc.). Show the beginning time for each job and ending time for the whole process adding hours throughout the process. A -0 number of hours B-5 number of hours C-8 number of hours D-10 number of hours E-17 number of hours A B C D E 0 enter a number of hours enter a number of hours enter a number of hours enter a number of hours enter a number of hours enter a number of hours PressA lab provides ultrasound service to patients. The service process consists of two steps: 1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time = 6 minutes/patient) 2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process time = 20 minutes/patient) Note that the ultrasound images need to be read by radiologists, but we assume that they have an ample capacity and thus will not model the role in the service process. Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more receptionists and/or technicians to increase the service capacity to at least 14 patients/hr. What would be the extra payroll cost (in dollars per hr)?Line processes generally have lower volumes as compared to job processes. True False
- Patients are arriving at a clinic at a rate of two per minute. Each patient's visit consists of four steps: check in, record vital signs, receive treatment, and check out. A receptionist takes 1 minute to check a patient in. A nurse takes 2 minutes to record the patient's vital signs. A doctor spends 10 minutes with a patient. A staff member takes 3 minutes to check a patient out. What is the process capacity in patients per hour?Wally's Widget Warehouse takes orders from 7 A.M. to 7 P.M. The manager wants to analyze the process and has provided the following process flow diagram. There are three steps required to ship a customer order. The first step is to take the order from a customer. The second step is to pick the order for the customer, and then they have to pack the order to ready it for shipping. The order-taking step works at a maximum rate of 100 customer orders per hour. Order picking works at a maximum of 75 per hour, and packing works at 60 per hour. Customers Order Taker 100 Customers/ hour Current maximum output Pick orders Pack orders Customer Orders Pick Orders 75 Customers/ hour hours hours Picked Orders Wally wants to figure out the following. a. What is the current maximum daily output of the process assuming that no one works overtime? (i.e., meaning all three operations work a 12-hour shift) units per day Pack Orders 60 Customers/ hour Wait for Shipper b. How long (in hours) will the…The ClickClock corporation produces clocks with six stations. Each station is manned by a human worker, who do the following tasks: These workers get paid $ 10 an hour. Ignore any Station Task Sequence Processing Time (secs) Task Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A Check switch travel Clean inside bezel Install module in bezel Total time for B Install battery clip in module Heat-stake battery clip in module Install two batteries in module Check switch 14 2 26 A 3 10 Preparation 1 4 18 68 23 B 6 12 Preparation 2 7 25 60 8 20 9 20 Battery 10 22 Installation 11 8. Total time for C 70 Install band Inspect band Total time for D Cosmetic inspection Final test D 12 45 Band 13 13 Installation 58 E 14 4 Packaging 15 71 Preparation Total time for E 75 Place watch and cuff in display box Place cover in display box base 16 20 17 14 Watch 18 Place owner's manual and box into tub 30 packaging Total time for F 64
- Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami 0.75 minutes 0.75 minutes 0.75 minutes 0.75 minutes 1.4 minutes 1.4 minutes - - - - 3 minutes 3 minutes 2 minutes 2 minutes 2 minutes 2 minutes 0.5 minutes 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no matter which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. What is the implied utilization of each of the five steps in this process? Cut ____% Grill ____% Slice ____% Toast…AssumMe a customer orders a product online. SupPpose that the product is delivered later in the weEek. The time between the order placement and order delivery is known as: a. waitT time b. queue time c. cycle time d. process timeThe OR is available for 12 hours a day; the hospital has decided to not perform any procedures between 7pm and 7am. This time is equally divided across three surgeons. The standard procedure time for the knee surgery done at the clinic is 1h. The cleaning and housekeeping that needs to happen after each procedure takes 20 minutes. Almost all of this time could be saved if the cleaning crew were notified earlier on. 10 minutes are spent on patient preparation / anesthesia work before each procedure. (Note: this is not part of the 60-minute procedure time). Proposals have been evaluated to move these 10 minutes to outside the OR, and there exists no medical reason that would prohibit doing this.) A surgeon only starts a case if all of the work associated with the case (preparation, procedure, and cleaning) can be completed in the 4h allotted to each surgeon. Surgeons never start BEFORE their allotted time. Though the clinic aims to operate 7 days a week, holidays, vacation, and…