A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches. The process capability ratio, Cp, of the operation is: Group of answer choices a Less than 1 b Greater than or equal to 1 but less than 1.25 c Greater than or equal to 1.25 but less than 1.5 d Greater than or equal to 1.5 but less than 1.75 e Greater than or equal to 1.75 but less than 2 f Greater than or equal to 2
A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches. The process capability ratio, Cp, of the operation is: Group of answer choices a Less than 1 b Greater than or equal to 1 but less than 1.25 c Greater than or equal to 1.25 but less than 1.5 d Greater than or equal to 1.5 but less than 1.75 e Greater than or equal to 1.75 but less than 2 f Greater than or equal to 2
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
SCENARIO A:
A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches.
The process capability ratio, Cp, of the operation is:
Group of answer choices
a Less than 1
b Greater than or equal to 1 but less than 1.25
c Greater than or equal to 1.25 but less than 1.5
d Greater than or equal to 1.5 but less than 1.75
e Greater than or equal to 1.75 but less than 2
f Greater than or equal to 2
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.