A toy factory creates miniature steel train engines and box cars. The fabrication department has 4,019 minutes available per week and the assembly and finishing department has 8,699 minutes available per week. Manufacturing one miniature steel train engine requires 8 minutes of fabrication and 15 minutes of assembling and finishing. Manufacturing one miniature steel box car requires 6 minutes of fabrication and 15 minutes of assembling and finishing. The profit on each miniature steel train engine is $6.50 and the profit on each miniature steel box car is $5.25. How many steel train engines and steel box cars should be produced each week to obtain the maximum profit? Find the maximum weekly profit. (Use z for box car and y for train engine.). Maximize P ≤4,019 subject to <8,699 Enter the solution to the simplex matrix below. If there is no solution enter 'DNE' in the boxes below. If more than one solution exists, enter only one of the multiple solutions below. If needed round toys to 1 decimal palace and profit to 2 decimal places. Number of miniature steel box cars to manufacture to maximize profit is Maximum profit is $ Number of miniature steel train engines to manufacture to maximize profit is

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
A toy factory creates miniature steel train engines and box cars. The fabrication department has 4,019
minutes available per week and the assembly and finishing department has 8,699 minutes available per
week. Manufacturing one miniature steel train engine requires 8 minutes of fabrication and 15 minutes of
assembling and finishing. Manufacturing one miniature steel box car requires 6 minutes of fabrication and
15 minutes of assembling and finishing.
The profit on each miniature steel train engine is $6.50 and the profit on each miniature steel box car is
$5.25. How many steel train engines and steel box cars should be produced each week to obtain the
maximum profit? Find the maximum weekly profit.
(Use z for box car and y for train engine.)
Maximize P =
≤4,019
subject to
<8,699
Enter the solution to the simplex matrix below. If there is no solution enter 'DNE' in the boxes below. If
more than one solution exists, enter only one of the multiple solutions below. If needed round toys to 1
decimal palace and profit to 2 decimal places.
Number of miniature steel box cars to manufacture to maximize profit is
Maximum profit is $
Number of miniature steel train engines to manufacture to maximize profit is
Transcribed Image Text:A toy factory creates miniature steel train engines and box cars. The fabrication department has 4,019 minutes available per week and the assembly and finishing department has 8,699 minutes available per week. Manufacturing one miniature steel train engine requires 8 minutes of fabrication and 15 minutes of assembling and finishing. Manufacturing one miniature steel box car requires 6 minutes of fabrication and 15 minutes of assembling and finishing. The profit on each miniature steel train engine is $6.50 and the profit on each miniature steel box car is $5.25. How many steel train engines and steel box cars should be produced each week to obtain the maximum profit? Find the maximum weekly profit. (Use z for box car and y for train engine.) Maximize P = ≤4,019 subject to <8,699 Enter the solution to the simplex matrix below. If there is no solution enter 'DNE' in the boxes below. If more than one solution exists, enter only one of the multiple solutions below. If needed round toys to 1 decimal palace and profit to 2 decimal places. Number of miniature steel box cars to manufacture to maximize profit is Maximum profit is $ Number of miniature steel train engines to manufacture to maximize profit is
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.