Kofi Abebrese runs a small industrial company that specialize in the production of high standard windows for housing estates. A worker is paid GHC0.9 per hour and can produce two window with an hour. Each window uses a frame costing GHC1 and incur a variable overheads of GHC0.7. Each window sells for GH¢3. Currently, due to the economic condition, work is rather slack and three employees are occupied in carrying out extensive repairs to Kofi Abebrese's own house. Kofi owns a warehouse next to the factory, which had been used as a factory store, in the past. It is now let out on a renewable annual lease of GHC600. A new building company, Allied Consult, which specializes in the production of prefabricated houses has asked Kofi if he would be interested in accepting a contract for GHC30,000 which will be for a year initially, to produced molded internal building sections. Kofi estimates that, the contract will take 13,200 hours of works, or the work of five men for a year, and that variable overheads would be GH¢10,000. The work would have to replace 9,600 hours of existing work. He estimates that the material required for the contract would cost GHC6,000. Alternatively, the work could be carried out in the warehouse; the lease is due to be renewed next month. Kofi thinks this would involve the company in an extra cost of GHC300 for heating and the cost of power would increase by GHc500. He would hire two new workers and pay them GH¢2,200 each per annum. If the contract was carried out in the warehouse, the other three workers would be those at present repairing Kofi's house. The three workers are paid GHC7,700 per annum in total and it would cost GHC2,500 to get an outside contractor to finish the house repairs. Required a. Advise Kofi on what to do. b. Consider the long term implications this decision might have on Kofi's business

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Kofi Abebrese runs a small industrial company that specialize in the production of high standard windows for housing estates. A worker is paid GHC0.9 per
hour and can produce two window with an hour. Each window uses a frame costing GHC1 and incur a variable overheads of GHC0.7. Each window sells for
GH¢3. Currently, due to the economic condition, work is rather slack and three employees are occupied in carrying out extensive repairs to Kofi Abebrese's
own house. Kofi owns a warehouse next to the factory, which had been used as a factory store, in the past. It is now let out on a renewable annual lease of
GHC600. A new building company, Allied Consult, which specializes in the production of prefabricated houses has asked Kofi if he would be interested in
accepting a contract for GHC30,000 which will be for a year initially, to produced molded internal building sections. Kofi estimates that, the contract will
take 13,200 hours of works, or the work of five men for a year, and that variable overheads would be GH¢10,000. The work would have to replace 9,600
hours of existing work. He estimates that the material required for the contract would cost GHC6,000. Alternatively, the work could be carried out in the
warehouse; the lease is due to be renewed next month. Kofi thinks this would involve the company in an extra cost of GHC300 for heating and the cost of
power would increase by GHc500. He would hire two new workers and pay them GH¢2,200 each per annum. If the contract was carried out in the
warehouse, the other three workers would be those at present repairing Kofi's house. The three workers are paid GHC7,700 per annum in total and it would
cost GHC2,500 to get an outside contractor to finish the house repairs.
Required
a. Advise Kofi on what to do.
b. Consider the long term implications this decision might have on Kofi's business
Transcribed Image Text:Kofi Abebrese runs a small industrial company that specialize in the production of high standard windows for housing estates. A worker is paid GHC0.9 per hour and can produce two window with an hour. Each window uses a frame costing GHC1 and incur a variable overheads of GHC0.7. Each window sells for GH¢3. Currently, due to the economic condition, work is rather slack and three employees are occupied in carrying out extensive repairs to Kofi Abebrese's own house. Kofi owns a warehouse next to the factory, which had been used as a factory store, in the past. It is now let out on a renewable annual lease of GHC600. A new building company, Allied Consult, which specializes in the production of prefabricated houses has asked Kofi if he would be interested in accepting a contract for GHC30,000 which will be for a year initially, to produced molded internal building sections. Kofi estimates that, the contract will take 13,200 hours of works, or the work of five men for a year, and that variable overheads would be GH¢10,000. The work would have to replace 9,600 hours of existing work. He estimates that the material required for the contract would cost GHC6,000. Alternatively, the work could be carried out in the warehouse; the lease is due to be renewed next month. Kofi thinks this would involve the company in an extra cost of GHC300 for heating and the cost of power would increase by GHc500. He would hire two new workers and pay them GH¢2,200 each per annum. If the contract was carried out in the warehouse, the other three workers would be those at present repairing Kofi's house. The three workers are paid GHC7,700 per annum in total and it would cost GHC2,500 to get an outside contractor to finish the house repairs. Required a. Advise Kofi on what to do. b. Consider the long term implications this decision might have on Kofi's business
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.