A theater needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee. However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing information for three types of units are provided. The theater wants to determine how many of each unit should be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model that computes the total cost for any mix of units built and rented, as well as the total hours required for carpenters and painters. Experiment with the model by testing each of the possible best solutions, included, to attempt to find the best solution that meets the labor availability and the required number of units of each type. CIGK the icon tO view the materalrequremenis and pricino initormation Click here to view some possible best solutions. The best solution requires building flat(s).O hanging drop(s), and prop(s) at a cost of S, and renting flat(s), hanging drop(s), and prop(s) at a cost of S. The total cost will be S
A theater needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee. However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing information for three types of units are provided. The theater wants to determine how many of each unit should be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model that computes the total cost for any mix of units built and rented, as well as the total hours required for carpenters and painters. Experiment with the model by testing each of the possible best solutions, included, to attempt to find the best solution that meets the labor availability and the required number of units of each type. CIGK the icon tO view the materalrequremenis and pricino initormation Click here to view some possible best solutions. The best solution requires building flat(s).O hanging drop(s), and prop(s) at a cost of S, and renting flat(s), hanging drop(s), and prop(s) at a cost of S. The total cost will be S
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
![A theater needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee.
However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing information for three types of units are provided. The theater wants to determine how many of
each unit should be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model that computes the total cost for any mix of units built and rented, as well as the total hours required for carpenters and
painters. Experiment with the model by testing each of the possible best solutions, included, to attempt to find the best solution that meets the labor availability and the required number of units of each type.
CICKINA ICon O VIAW the matera requremenis and prcino intormaion
Click here to view some possible best solutions.
The best solution requires building flat(s).O hanging drop(s), and prop(s) at a cost of S, and renting
(Type integers or decimals. Do not round.)
flat(s).O hanging drop(s), and prop(s) at a cost of S. The total cost will be S](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F7e5dd473-b674-4a67-9029-5d1b11c706c9%2Fff29a402-d926-444b-9b59-a86dedf6fd51%2F2s0ojmm_processed.png&w=3840&q=75)
Transcribed Image Text:A theater needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee.
However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing information for three types of units are provided. The theater wants to determine how many of
each unit should be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model that computes the total cost for any mix of units built and rented, as well as the total hours required for carpenters and
painters. Experiment with the model by testing each of the possible best solutions, included, to attempt to find the best solution that meets the labor availability and the required number of units of each type.
CICKINA ICon O VIAW the matera requremenis and prcino intormaion
Click here to view some possible best solutions.
The best solution requires building flat(s).O hanging drop(s), and prop(s) at a cost of S, and renting
(Type integers or decimals. Do not round.)
flat(s).O hanging drop(s), and prop(s) at a cost of S. The total cost will be S
![Material Requirements and Pricing Information
The theater has two part-time carpenters who work up to 15 hours a week, each at
$10 an hour, and a part-time scenic artist who can work 18 hours per week to paint
the set and props as needed at a rate of $14 per hour. The set design requires 25
flats (walls), 2 hanging drops with painted scenery, and 2 large wooden tables
(props). The number of hours required for each piece for carpentry and painting is
shown in the accompanying table. Flats, hanging drops, and props can also be
rented at a cost of $70.00, $500.00, and $350.00, respectively.
Carpentry
Painting
Flats
0.5
2.0
10.0
Hanging Drops
Props
1.5
2.0
4.0
Print
Done](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F7e5dd473-b674-4a67-9029-5d1b11c706c9%2Fff29a402-d926-444b-9b59-a86dedf6fd51%2Fxqmofc_processed.png&w=3840&q=75)
Transcribed Image Text:Material Requirements and Pricing Information
The theater has two part-time carpenters who work up to 15 hours a week, each at
$10 an hour, and a part-time scenic artist who can work 18 hours per week to paint
the set and props as needed at a rate of $14 per hour. The set design requires 25
flats (walls), 2 hanging drops with painted scenery, and 2 large wooden tables
(props). The number of hours required for each piece for carpentry and painting is
shown in the accompanying table. Flats, hanging drops, and props can also be
rented at a cost of $70.00, $500.00, and $350.00, respectively.
Carpentry
Painting
Flats
0.5
2.0
10.0
Hanging Drops
Props
1.5
2.0
4.0
Print
Done
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 3 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.