A tall concrete is an obstruction along a level route between points A and B. To proceed with the leveling work, an inverse method of leveling is executed at the vicinity of the obstruction where rod readings were taken with the rod held upside down as shown in the figure. From the observed data portrayed in the figure, determine the elevation of point B. Bottom of Rod Held Flushed with top of Wall Leveling Rod (Held upside down) Leveling Rod- -Leveling Rod (Hold upside down) 3.05 m 1.60 m Concrete Wall 4.92 m 3.68 m Tst Setup of Instr. Elov, 528.25m 2nd Setup of tnstr. а. 526.30 m b. 524.30 m с. 525.30 m d. 527.30 m e. not included on the list

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A tall concrete is an obstruction along a level route between points A and B. To proceed with
the leveling work, an inverse method of leveling is executed at the vicinity of the obstruction
where rod readings were taken with the rod held upside down as shown in the figure. From
the observed data portrayed in the figure, determine the elevation of point B.
Bottom of Rod Held
Flushed with top of Wall
Leveling Rod
(Held upside down)
Leveling Rod-
-Leveling Rod
(Hold upside down)
3.05 m
1.60 m
Concrete
Wall
4.92 m
3.68 m
Tst Setup
of Instr.
Elov, 528.25m
2nd Setup
of tnstr.
а. 526.30 m
b. 524.30 m
с. 525.30 m
d. 527.30 m
e. not included on the list
Transcribed Image Text:A tall concrete is an obstruction along a level route between points A and B. To proceed with the leveling work, an inverse method of leveling is executed at the vicinity of the obstruction where rod readings were taken with the rod held upside down as shown in the figure. From the observed data portrayed in the figure, determine the elevation of point B. Bottom of Rod Held Flushed with top of Wall Leveling Rod (Held upside down) Leveling Rod- -Leveling Rod (Hold upside down) 3.05 m 1.60 m Concrete Wall 4.92 m 3.68 m Tst Setup of Instr. Elov, 528.25m 2nd Setup of tnstr. а. 526.30 m b. 524.30 m с. 525.30 m d. 527.30 m e. not included on the list
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Site plan requirements
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning