A secondary road in a developing country, 30 miles long, is to be improved by surface treating the gravel surface without any change in length. The cost of the improvement is estimated at $150,000 per mile. A present annual transport cost for all traffic on the existing road (vehicle operating cost, maintenance cost, etc.) is estimated at $205,000 per mile. After improvement, this is expected to reduce to $170,000 per mile per annum. Reconstruction takes place in two years with equal expenditures in each year. Assume that in the second year of construction, transport cost on the improved road is equivalent to present costs in half the length and new transport cost on the other half. Would you undertake the project? (The minimum attractive rate of return (MARR) is 8.5% and the project life is 20 years after reconstruction.) Resealing would be required 10 years after reconstruction at a cost of $55,000 per mile. Use the net present worth method

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A secondary road in a developing country, 30 miles long, is to be improved by surface treating the gravel surface without any change in length. The cost of the improvement is estimated at $150,000 per mile. A present annual transport cost for all traffic on the existing road (vehicle operating cost, maintenance cost, etc.) is estimated at $205,000 per mile. After improvement, this is expected to reduce to $170,000 per mile per annum. Reconstruction takes place in two years with equal expenditures in each year. Assume that in the second year of construction, transport cost on the improved road is equivalent to present costs in half the length and new transport cost on the other half. Would you undertake the project? (The minimum attractive rate of return (MARR) is 8.5% and the project life is 20 years after reconstruction.) Resealing would be required 10 years after reconstruction at a cost of $55,000 per mile. Use the net present worth method
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Knowledge Booster
Highway safety
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning