A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table. The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed construction site are provided in the table. Determine the volume of each borrow pit soil required to meet the specification of the embankment site. b. Make the necessary calculations to select the borrow pit which would be most cost-effective. а. Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 IV 0.89 2.73 10

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Problem 3:
A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is
specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table.
The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed
construction site are provided in the table.
a. Determine the volume of each borrow pit soil required to meet the specification of the embankment site.
b. Make the necessary calculations to select the borrow pit which would be most cost-effective.
Borrow pit
Void ratio
G,
Cost ($/m³)
I
0.85
2.66
11
II
0.92
2.69
8
III
1.21
2.71
9.
IV
0.89
2.73
10
Transcribed Image Text:Problem 3: A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill is specified as 0.7. Soil can be transported from one of the four borrow pits, as described in the following table. The void ratio, specific gravity of soil solids, and the cost per cubic meter for moving the soil to the proposed construction site are provided in the table. a. Determine the volume of each borrow pit soil required to meet the specification of the embankment site. b. Make the necessary calculations to select the borrow pit which would be most cost-effective. Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 9. IV 0.89 2.73 10
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning