For the proposed fill shown in Figure 11.29, assume the ultimate consolidation settlement is 1.6 ft. The owner wants to build a structure on top of the fill. The structure can withstand a total settlement of 4 in. How long must the owner wait after placement of the fill before building the structure on top of the fill? Use the simplified method.
For the proposed fill shown in Figure 11.29, assume the ultimate consolidation settlement is 1.6 ft. The owner wants to build a structure on top of the fill. The structure can withstand a total settlement of 4 in. How long must the owner wait after placement of the fill before building the structure on top of the fill? Use the simplified method.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%

Transcribed Image Text:Proposed fill
Silty sand (SM)
Soft clay (CL)
Cy = 0.17 ft²/day
Stiff clay (CH)
(assume impermeable)
y = 120 lb/ft³
24 ft.
F.I
20 ft
10 ft
FIGURE 11.29 Soil profile for Problems 11.5-11.7
and 11.10.
: 10 ft
25 ft

Transcribed Image Text:For the proposed fill shown in Figure 11.29, assume the ultimate consolidation settlement
is 1.6 ft. The owner wants to build a structure on top of the fill. The structure can withstand
a total settlement of 4 in. How long must the owner wait after placement of the fill before
building the structure on top of the fill? Use the simplified method.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 5 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Expert Answers to Latest Homework Questions
Q: If you give me correct answer this general accounting question I will give you helpful rate
Q: Hello tutor please given correct answer general accounting question
Q: What is the contribution margin per machine hour on this financial accounting question?
Q: 5:06
one
REPORT WRITING
Cover page -
Table of contents
Executive summary
Introduction
Conclusion…
Q: Find the discharge if K entrance =0.1, Kvalve-1, e=0.26mm, U= 1×
10-6m²
?
sec
5 m
Water at
20°C
6 cm…
Q: What will its net income on these financial accounting question?
Q: What level (h) must be maintained in Fig to deliver a flow rate of Q=0.425L/sec in
commercial-steel…
Q: General Accounting Question need help
Q: Given correct answer general Accounting question
Q: Need help with this general accounting question
Q: Hi expert please give me answer general accounting question
Q: "Please, the answer must be documented from a
book, experience, or accurate information without…
Q: Compute the predetermined overhead allocation rate of this financial accounting question
Q: What i s the adjustment amount to accrue interest on december 31,2017 ?
Q: please see an attachment for details of general accounting
Q: Question 2
Your company has been awarded a contract to erect 124 pylons for an
electricity company.…
Q: Please give answer the following requirements on these financial accounting question
Q: Don't use ai given answer general accounting questions
Q: What is the cost of goods manufactured on these financial accounting question?
Q: Do fast of this question answer general Accounting
Q: General Accounting