A proposed embankment fill requires 5000 m of compaction soil. The void ratio of the compacted fill is specified as 0.70. Three borrow pits are available as described in the following table. Borrow Pit Void Ratio Cost/m3 A 0.85 Php830 B. 0.95 Php760 C 1.10 Php720 What is the total cost for acquiring soil from borrow pit C?
Q: settlement of the clay layer due to placing of fill material will be
A:
Q: Q1: A self- propelled tamping foot compactor will be used to compact a fill being constructed of…
A: The soil is compressed or tightened by means of compaction and consolidation of the soil. The…
Q: The clay layer below was subjected to a surcharge that would a total settlement of 10 inches. If C,…
A: solution Given total settlement Sf=10inches required settlement S=5inches sp the degree of…
Q: A proposed embankment fill required 8000 m3 of compacted soil. The void ratio of the compacted fill…
A: Vtotal = V = 8000 m3 & ereq = 0.6We know that, V = Vv + VsWhere, Vv = Volume of voids…
Q: Problem 1: An embankment with a total volume of 20,000 cu.m. is to be constructed as part of a…
A: To find Weight of dry soil required Volume of borrow required. Volume of water required.
Q: From the following data, solve for the degree of compaction. If this is for Item 201, Aggregate Base…
A:
Q: An airport runway fill needs 600,000 m³ of soil compacted to a void ratio of 0.75. There are two…
A: For an airport runway,Volume of fill needed =600,000 m3Void rato,e=0.75To check correct option
Q: A brown silty sand fill 5 m thick was placed over a 15 m thick layer of compressible gray silty…
A: Given: Initial void ratio, e0=1.1Compression index, Cc=0.36Secondary Compression index,…
Q: A proposed embankment till requires 50X0 m'of conmpacted soil. The void ratio of the compacted till…
A: After compaction, the volume of soil solids will be constant.
Q: In a certain portion of a road construction, the following data were taken; Cost of haul = P30 per…
A: Introduction- A haul road, also known as a haulage road or a haul track, is a type of road used in…
Q: A proposed embankment fill requires 7500 m³ of compacted soil. The void ratio of the compacted fill…
A: Given: The volume of the embankment fill is 7500 m3. The void ratio of compacted soil is 0.7. The…
Q: Problem 1: 0.48mm, D30 0.25mm, and D10 For a gravel with D60 coefficient and the coefficient of…
A: The uniformity coefficient is given as:The coefficient of gradation is given as:Considered together,…
Q: 8.5 m compacted fill is to be placed over the soil profile. Consolidation tests are done on samples…
A: Hfill = 8.5m = 20.3 kN/m3
Q: The following technical data are given below: Overburden pressure = 180KPa Increase in pressure =…
A: Given, Overburden pressure = 180KPa Increase in pressure = 140KPa Clay thickness = 8m…
Q: Soil for a compacted earth fill is available from three different borrow sites. At the earth fill,…
A: GIVEN- e=0.62V=150,000 m3
Q: A Site requires 250,000 m3 of soil having a void ratio of 0.45, determine the required volume of…
A: Please refer the attached image for complete solution. THANK YOU.
Q: Find out the amount of soil required to be excavated from a borrow pit in cubic meter. If the voids…
A: Given- Void ratio of borrow pit=1.4 volume of fill=150000 cum void ratio of fill=0.8
Q: A road embankment is to be constructed in Postal Highway of Terai region having a total volume of…
A:
Q: 2: Děšign and Analysis - make sure to show all calculations, correct units and box answers for all…
A: Compaction Compaction is the mechanical process of raising soil density while removing air. The…
Q: Q1-A: Soil excavated from a borrmw arca is beine used to construct an embankment. The void ratio o…
A: To find volume of soil in compacted fill
Q: The 20ft high clay fill shown below is proposed to be constructed over a layer of soft clay. A 5ft…
A: Given: The properties of soft clay: OCR=1.5Cc=0.22Cr=0.03Cv=0.35e0=1.0 Consider the figure,
Q: A fill of volume 160000 cum is to be made of void ratio 0.75. The void ratio of borrow pit soil is…
A: Given: Volume of fill = 160000 cum Void ratio of fill = 0.75 Void ratio of borrow pit = 1.5
Q: A proposed earthen dam will contain 5,000,000 m3 of earth. Soil to be taken from a borrow pit will…
A:
Q: A pit of volume 16x104 cum is to be filled in such a way that its void ratio comes out to be 0.75.…
A: Given: Volume of pit, V = 16 x 104 cum Void ratio of pit soil = 0.75 Void ratio of borrow soil = 1.5
Q: A fill of volume 150000 cum is to be made of void ratio 0.8. The void ratio of borrow pit soil is…
A: Given: Volume of fill = 150000 cum Void ratio of fill = 0.8 Void ratio of borrow pit = 1.4
Q: Calculate the number of days required to dig a dirt road with a length of (4 km), a width of 300 cm)…
A: To solve this problem, we need to first calculate the volume of the dirt road in cubic meters. To do…
Q: On the construction side, there is soil material of volume 3,853 cubic feet. A truck with a load…
A:
Q: Explain in detail Maximum Dry Density and Optimum Moisture Content of soil? Explain in 5 sentences…
A: Maximum dry density MDD: Maximum dry density is the density of soil which corresponds to hardest…
Q: 4) Why do we engineers provide specifications (i.e., relative compaction limits and allowable…
A: We have to determine why engineers provide specification to contractors for compacting the soil like…
Q: The soil from a borrow area is excavated and used in a compacted fill for an embankment. The void…
A: Volume of solids will remain constant. i.e, the mass of solid and its specific gravity remain…
Q: a. Determine the volume of each borrow pit soil required to meet the specification of the embankment…
A: Given data-
Q: An approach road for a bridge needs 60000 m 3 of soil compacted to a void ratio of 0.7. There are…
A: Data given:Volume of soil required (V) =60000m3void ratio (e) =0.7Borrow pit Void ratio(e)…
Q: The degree of compaction of sand in the field is 93.5%. Considering a dry specific weight maximum…
A: Step 1: γd max =17.7 kN / m3 Degree of compaction = Field dry unit weight/Max dry unit weight
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- the excavated soil? 5.9 A proposed embankment fill requires 3500 m' of compacted soil. The void ratio of the compacted fill is specified as 0.65. Four borrow pits are available, as described in the following table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Make the necessary calculations to select the y not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). I materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it. ction from which the soil should be bought to minimize the cost. Assume G, pe the same at all pits. Borrow pit Void ratio Cost (S/m) 0.85 1.2 0.95 10 0.75 ABCD30. The proposed embankment fill requires 8000m³of compacted soil. The void ratio of the compacted fill is specified as 0.70. Four borrow pits are available as described in the following table, which list the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Assume that the specific gravity is the same at all pits, which among the pits should be bought to minimize the cost? Borrow Pit Void Ratio Cost (P/m³) A 0.82 400 B 0.9 450 1.1 250 D 0.78 600- Once answered correctly will UPVOTE!!
- A proposed embankment fill requires 8000 ?3 of compacted soil. The void ratio of the compacted fill is specified as 0.70. Four borrow pits are available as described in the table which list the respective void ratios of the soil and cost per cubic meter for moving the soil to the proposed construction site. Make necessary calculations to select pit from which the soils should be bought to minimize the cost. Assume specific gravity to be the same at all pits.Problem 2: A proposcd embankment fill requires 5000 cu.m. of compacted soil. The void ratio of the compacted fill is specified as 0.70. Four borrow pits are available, as described in the following table, which lists the respective void ratios of the soil and the cost per cu.m. for moving the soil to the proposed construction site. Borrow Pit Void Ratio Transportation Cost (Pesos /m²) A 0.85 P 800.00 / m³ B 1.20 P 650.00 / m3 0.95 P 750.00 / m³ D 0.75 P 950.00 / m³ 1. What is the cost for borrow pit A? 2. What is the cost for borrow pit B? 3. Select the pit from which the soil should be bought to minimize the cost. Assume Gs to be the same at all pits.year Q3/Complete the earthwork calculation sheet and plot the resulting mass diagram. Assuming Shrinkage-10% (20 Marks) Length along road 100 m End area cut (m²) End area fill (m²) Volume of cut (m²) Volume of fill (m³) Adj. fill Mass diagram (m³) ordinate (四) 0 0 0 2 400 4 300 0 6 0 0 8 0 100 10 0 300 12 0 200 14 0 0 16 200 0 18 0 0 0 20 200
- An approach road for a bridge needs 60000 m3 of soil compacted to a void ratio of 0.7. There are two borrow pits A and B from where the required soil can be taken and transported to the site. The borrow pit A has void ratio 0.85 and borrow pit B has void ratio 0.95. If the cost of excavation of soiland transportation is Rs. 20/10 m3for area A and Rs. 22/10 m3for area B, which of the borrow area is more economical? G=2.67Complete the earthwork calculation sheet here and plot the resulting mass diagram. Divide ccy by 0.9 to convert to bcy.A proposed embankment fill required 8000 m3 of compacted soil. The void ratio of the compacted fill is specified to be 0.6. Four available borrow pits are shown below along with the void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Make the necessary calculations to select the pit from which the soil should be brought to minimize the cost. Assume Gs to be the same for all borrow-pit soil.
- 13. An earth dam requires one million cubic meter of soil compacted to a void ratio of 0.8. In the vicinity of the proposed dam, three borrow pits were identified as having suitable materials. The cost of purchasing the soil and the cost of excavation are the same for each borrow pit. The only difference of the cost for each borrow pit is the cost of transportation. a. Borrow pit No. 1 2 3 Void Ratio Which borrow borrow economical? 1.8 0.9 1.5 Transportation Cost ($/m³) 0.6 1 0.75 pit pit would be would be the most3. Three boreholes (BH) along a proposed road intersection are shown in Figure la and b. The soils in each borehole were classified using ASTM-CS. Sketch a soil profile along the center line. BH ВН 2 BH 3 100 m 100 m (a) Plan El: 100.2 El: 99.5 E1: 102.7 SP ML CH 10 SP-SM 15 - GP-GM ВН 2 ВН З 20 ВН 1 (b) Borehole soil Figure 1 Depth (m)Suppose that you are a Project Engineer on a Dam project. The volume of soil required at the dame site is Vd=100,000m3. The final void ratio (ed) is 0.80. Your boss, the Project Manager delegates to you the important decision of buying the earth fill from one of three suppliers. • Supplier X sells fill at OMR. 0.200/m3 with e = 0.90• Supplier Y sells fill at OMR. 0.120/m3 with e = 2.00• Supplier Z sells fill at OMR. 0.150/m3 with e = 1.60Evaluate and select the best supplier based on your knowledge about soil compaction.