A proposed embankment till requires 50X0 m'of conmpacted soil. The void ratio of the compacted till is specified as 0.7. Four borrow pits are available as described in the follwing table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed con- struction site. Make the necessary calculations to select the pit from which the soil should be bought to minimmize the cost. Assume G, to be thc same at all pits. Borrow pit Void ratio Cost (S/m') O0.8.5 53 1.2 0.95 0,75
A proposed embankment till requires 50X0 m'of conmpacted soil. The void ratio of the compacted till is specified as 0.7. Four borrow pits are available as described in the follwing table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed con- struction site. Make the necessary calculations to select the pit from which the soil should be bought to minimmize the cost. Assume G, to be thc same at all pits. Borrow pit Void ratio Cost (S/m') O0.8.5 53 1.2 0.95 0,75
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
A proposed embankment till requires 5000 m of compacted soil. The void ratio of the compactedd till is specilied as 0.7. Four borroww pits are available as described in the following table. which lists the respective void ratios of the soil and the cost per cubic mcter for moving the soil to the proposed con- struction site. Make the necessary calculations to sclect the pit from which the soil should be bought to minimize the cost. Assume G, to be the same at all pits.

Transcribed Image Text:A proposed embankment till requires 50X0 m'of conmpacted soil. The void
ratio of the compacted till is specified as 0.7. Four borrow pits are available
as described in the follwing table, which lists the respective void ratios of
the soil and the cost per cubic meter for moving the soil to the proposed con-
struction site. Make the necessary calculations to select the pit from which
the soil should be bought to minimmize the cost. Assume G, to be thc same at
all pits.
Borrow pit
Void ratio
Cost (S/m')
O0.8.5
53
1.2
0.95
0,75
Expert Solution

Trending now
This is a popular solution!
Step by step
Solved in 10 steps with 14 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning