A proposed embankment fill requires 5000 m² of compacted soil. The specification requires dry unit weight of 18 kN/m, the specific gravity of soil is 2.70. Four borrow pits are available, as described in the following table, which lists the properties of the soil and the cost per m for moving the soil to the proposed construction site. Assume the specific gravity of the soil is 2.70 in each borrow pit. Unit Weight (kN/m³) Moisture Content (%) Cost (Pesos/m) Borrow Pit A 15.8922 11 855 B 13.2435 15 645 17.658 20 765 D 20.3067 15 945 13. Which of the following borrow pit will give the lowest cost for the embankment (indicate the amount)? Example Format: A-5 000 000

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A proposed embankment fill requires 5000 m² of compacted soil. The specification requires dry unit
weight of 18 kN/m, the specific gravity of soil is 2.70. Four borrow pits are available, as described in the
following table, which lists the properties of the soil and the cost per m for moving the soil to the
proposed construction site. Assume the specific gravity of the soil is 2.70 in each borrow pit.
Borrow Pit
Unit Weight (kN/m³)
Moisture Content (%)
Cost (Pesos/m')
A
15.8922
11
855
B
13.2435
15
645
17.658
20
765
20.3067
15
945
13. Which of the following borrow pit will give the lowest cost for the embankment (indicate the
amount)? Example Format: A -5 000 000
Transcribed Image Text:A proposed embankment fill requires 5000 m² of compacted soil. The specification requires dry unit weight of 18 kN/m, the specific gravity of soil is 2.70. Four borrow pits are available, as described in the following table, which lists the properties of the soil and the cost per m for moving the soil to the proposed construction site. Assume the specific gravity of the soil is 2.70 in each borrow pit. Borrow Pit Unit Weight (kN/m³) Moisture Content (%) Cost (Pesos/m') A 15.8922 11 855 B 13.2435 15 645 17.658 20 765 20.3067 15 945 13. Which of the following borrow pit will give the lowest cost for the embankment (indicate the amount)? Example Format: A -5 000 000
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning