If the company operates 2 shifts per day, 8 hours per shift, and 5 days per week, the capacity of this production system = units per week. Round the final answer to two decimal places, e.g., 0.12, when necessary. A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and simultaneously with, cutting and drilling, which are independent and sequential operations. A product needs to go through only one of the three parallel assembly operations. The product then proceeds to the last workstation for testing. Cutting 7.5 units/hour Drilling 10 units/hour Bending 6 units/hour Assembly 1.5 units/hour Welding 5 units/hour Assembly 1.5 units/hour Testing 4 units/hour Assembly 1.5 units/hour

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
If the company operates 2 shifts per day, 8 hours per shift, and 5 days per week, the
capacity of this production system =
units per week. Round the final answer to two decimal places, e.g., 0.12, when
necessary.
Transcribed Image Text:If the company operates 2 shifts per day, 8 hours per shift, and 5 days per week, the capacity of this production system = units per week. Round the final answer to two decimal places, e.g., 0.12, when necessary.
A production system at Lakeview Manufacturing is given in the flowchart below. The
bending operation occurs separately from, and simultaneously with, cutting and
drilling, which are independent and sequential operations. A product needs to go
through only one of the three parallel assembly operations. The product then
proceeds to the last workstation for testing.
Cutting
7.5 units/hour
Drilling
10 units/hour
Bending
6 units/hour
Assembly
1.5 units/hour
Welding
5 units/hour
Assembly
1.5 units/hour
Testing
4 units/hour
Assembly
1.5 units/hour
Transcribed Image Text:A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and simultaneously with, cutting and drilling, which are independent and sequential operations. A product needs to go through only one of the three parallel assembly operations. The product then proceeds to the last workstation for testing. Cutting 7.5 units/hour Drilling 10 units/hour Bending 6 units/hour Assembly 1.5 units/hour Welding 5 units/hour Assembly 1.5 units/hour Testing 4 units/hour Assembly 1.5 units/hour
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.