A new highway is to be constructed. Design A calls for a concrete pavement costing P3600 per foot with a 20-year life; two paved ditches costing P120 per foot each; and three box culverts every mile, each costing P360,000 and having a 20-year life. Annual maintenance will cost P72,000 per mile; the culverts must be cleaned every five years at a cost of P18,000 each per mile. Design B calls for a bituminous pavement costing P1800 per foot with a 10-year life; two sodded ditches costing P60 per foot each; and three pipe culverts every mile, each costing P90,000 and having a 10-year life. The replacement culverts will cost P96,000 each. Annual maintenance will cost P108,000 per mile; the culverts must be cleaned yearly at a cost of P9000 each per mile; and the annual ditch maintenance will cost P60 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 1/1 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% pe.

EBK CONTEMPORARY FINANCIAL MANAGEMENT
14th Edition
ISBN:9781337514835
Author:MOYER
Publisher:MOYER
Chapter11: Capital Budgeting And Risk
Section: Chapter Questions
Problem 15P
icon
Related questions
Question
A new highway is to be constructed. Design A calls for a concrete pavement costing P3600 per foot
with a 20-year life; two paved ditches costing P120 per foot each; and three box culverts every mile, each
costing P360,000 and having a 20-year life. Annual maintenance will cost P72,000 per mile; the culverts
must be cleaned every five years at a cost of P18,000 each per mile.
Design B calls for a bituminous pavement costing P1800 per foot with a 10-year life; two sodded
ditches costing P60 per foot each; and three pipe culverts every mile, each costing P90,000 and having a
10-year life. The replacement culverts will cost P96,000 each. Annual maintenance will cost P108,000 per
mile; the culverts must be cleaned yearly at a cost of P9000 each per mile; and the annual ditch maintenance
will cost P60 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a
1/1
20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% pe.
2.
Transcribed Image Text:A new highway is to be constructed. Design A calls for a concrete pavement costing P3600 per foot with a 20-year life; two paved ditches costing P120 per foot each; and three box culverts every mile, each costing P360,000 and having a 20-year life. Annual maintenance will cost P72,000 per mile; the culverts must be cleaned every five years at a cost of P18,000 each per mile. Design B calls for a bituminous pavement costing P1800 per foot with a 10-year life; two sodded ditches costing P60 per foot each; and three pipe culverts every mile, each costing P90,000 and having a 10-year life. The replacement culverts will cost P96,000 each. Annual maintenance will cost P108,000 per mile; the culverts must be cleaned yearly at a cost of P9000 each per mile; and the annual ditch maintenance will cost P60 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 1/1 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% pe. 2.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Capital Budgeting
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, finance and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
EBK CONTEMPORARY FINANCIAL MANAGEMENT
EBK CONTEMPORARY FINANCIAL MANAGEMENT
Finance
ISBN:
9781337514835
Author:
MOYER
Publisher:
CENGAGE LEARNING - CONSIGNMENT
Principles of Accounting Volume 2
Principles of Accounting Volume 2
Accounting
ISBN:
9781947172609
Author:
OpenStax
Publisher:
OpenStax College