A mining company owns two mines. These mines produce an ore that can be graded into two classes: regular grade and low grade. The company must produce at least 420 tons of regular - grade and 520 tons of low-grade ore per week. The first mine produces 6 tons of regular - grade and 18 tons of low-grade ore per hour. The second mine produces 18 tons of regular - grade and 9 tons of low-grade ore per hour. The operating cost of the first mine is $7000 per hour, and the operating cost of the second mine is $ 22,000 per hour. The first mine can be operated no more than 37 hours a week, and the second mine can be operated no more than 28 hours a week. How many hours per week should each mine be operated to minimize the cost?
A mining company owns two mines. These mines produce an ore that can be graded into two classes: regular grade and low grade. The company must produce at least 420 tons of regular - grade and 520 tons of low-grade ore per week. The first mine produces 6 tons of regular - grade and 18 tons of low-grade ore per hour. The second mine produces 18 tons of regular - grade and 9 tons of low-grade ore per hour. The operating cost of the first mine is $7000 per hour, and the operating cost of the second mine is $ 22,000 per hour. The first mine can be operated no more than 37 hours a week, and the second mine can be operated no more than 28 hours a week. How many hours per week should each mine be operated to minimize the cost?
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
![A mining company owns two mines. These mines
produce an ore that can be graded into two
classes: regular grade and low grade. The
company must produce at least 420 tons of regular
- grade and 520 tons of low-grade ore per week.
The first mine produces 6 tons of regular - grade
and 18 tons of low-grade ore per hour. The
second mine produces 18 tons of regular - grade
and 9 tons of low-grade ore per hour. The
operating cost of the first mine is $7000 per hour,
and the operating cost of the second mine is $
22,000 per hour. The first mine can be operated no
more than 37 hours a week, and the second mine
can be operated no more than 28 hours a week.
How many hours per
week should each mine be
operated to minimize the cost?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F4f82b590-03b7-450d-b438-2e771d1a9323%2Ff425c94f-526f-42f9-acf2-91f961a835fa%2F7jfmgq5_processed.png&w=3840&q=75)
Transcribed Image Text:A mining company owns two mines. These mines
produce an ore that can be graded into two
classes: regular grade and low grade. The
company must produce at least 420 tons of regular
- grade and 520 tons of low-grade ore per week.
The first mine produces 6 tons of regular - grade
and 18 tons of low-grade ore per hour. The
second mine produces 18 tons of regular - grade
and 9 tons of low-grade ore per hour. The
operating cost of the first mine is $7000 per hour,
and the operating cost of the second mine is $
22,000 per hour. The first mine can be operated no
more than 37 hours a week, and the second mine
can be operated no more than 28 hours a week.
How many hours per
week should each mine be
operated to minimize the cost?
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps with 3 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Mathematics For Machine Technology](https://www.bartleby.com/isbn_cover_images/9781337798310/9781337798310_smallCoverImage.jpg)
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
![Basic Technical Mathematics](https://www.bartleby.com/isbn_cover_images/9780134437705/9780134437705_smallCoverImage.gif)
![Topology](https://www.bartleby.com/isbn_cover_images/9780134689517/9780134689517_smallCoverImage.gif)