1. Chaka Furniture makes chairs, arm-chairs and sofas, the profits are Php 60 per chair, Php 70 per arm-chair and Php 90 per sofas. The material used to manufacture these items are fabric and wood. A supplier can provide a maximum of 310 meters of fabric and 360 units of wood each week. Each item requires a certain amount of wood and fabric as well as certain assembly time. These are given in the following table. Fabric 2m 5m 8m Available/ week 310m chair arm- chair sofa Wood 6 units 4 units. 5 units 360 units Ass. time 8 hrs 4 hrs 5 hrs 480 hrs How many chairs, arm-chairs and sofas that the company should make per week so that the total profit is maximized?
1. Chaka Furniture makes chairs, arm-chairs and sofas, the profits are Php 60 per chair, Php 70 per arm-chair and Php 90 per sofas. The material used to manufacture these items are fabric and wood. A supplier can provide a maximum of 310 meters of fabric and 360 units of wood each week. Each item requires a certain amount of wood and fabric as well as certain assembly time. These are given in the following table. Fabric 2m 5m 8m Available/ week 310m chair arm- chair sofa Wood 6 units 4 units. 5 units 360 units Ass. time 8 hrs 4 hrs 5 hrs 480 hrs How many chairs, arm-chairs and sofas that the company should make per week so that the total profit is maximized?
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
Operations Research 1
Do as Indicated
![1. Chaka Furniture makes chairs, arm-chairs and sofas, the profits are Php 60 per chair,
Php 70 per arm-chair and Php 90 per sofas. The material used to manufacture these
items are fabric and wood. A supplier can provide a maximum of 310 meters of fabric
and 360 units of wood each week. Each item requires a certain amount of wood and
fabric as well as certain assembly time. These are given in the following table.
Fabric
Wood
2m
6 units
5m
4 units.
8m
5 units
Available/ week 310m 360 units
chair
arm- chair
sofa
Ass. time
8 hrs
4 hrs
5 hrs
480 hrs
How many chairs, arm-chairs and sofas that the company should make per week so
that the total profit is maximized?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F86b9185f-88de-495e-b04a-9a6063b173db%2F025bb90f-c120-4857-8a32-b899e4c187be%2F7fy3jih_processed.png&w=3840&q=75)
Transcribed Image Text:1. Chaka Furniture makes chairs, arm-chairs and sofas, the profits are Php 60 per chair,
Php 70 per arm-chair and Php 90 per sofas. The material used to manufacture these
items are fabric and wood. A supplier can provide a maximum of 310 meters of fabric
and 360 units of wood each week. Each item requires a certain amount of wood and
fabric as well as certain assembly time. These are given in the following table.
Fabric
Wood
2m
6 units
5m
4 units.
8m
5 units
Available/ week 310m 360 units
chair
arm- chair
sofa
Ass. time
8 hrs
4 hrs
5 hrs
480 hrs
How many chairs, arm-chairs and sofas that the company should make per week so
that the total profit is maximized?
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Mathematics For Machine Technology](https://www.bartleby.com/isbn_cover_images/9781337798310/9781337798310_smallCoverImage.jpg)
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
![Basic Technical Mathematics](https://www.bartleby.com/isbn_cover_images/9780134437705/9780134437705_smallCoverImage.gif)
![Topology](https://www.bartleby.com/isbn_cover_images/9780134689517/9780134689517_smallCoverImage.gif)