A hydraulic excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations? complete solution
Q: Two sewer pipelines A and B (having the same diameter and made of the same material) are laid at a…
A: Given- Same diameter, same material, Bed slopes- SA= 1 in 225, SB = 1 in 625,
Q: Determine the Centroid of 3 Areas.
A:
Q: drainage basin has an area of 9350 km2. The average annual precipitation for this area is 827 mm.…
A:
Q: A 30 mm diameter vertical pipe conveys oil of dynamic viscosity of 1 poise and mass density of 0.85…
A:
Q: 1. Determine the slope at A and the maximum displacement of the beam. Take E = 29(103)ksi, I = 500…
A:
Q: Can just a single kind of candidate system be used in a construction?
A: Answer : Data provided : 1) Construction industry 2) What Kind of candidate system To Find :…
Q: The losses in a Y-branch in a pipe system carrying gas are to be determined by testing a model with…
A: The losses in a Y-branch in a pipe system carrying gas are to be determined by testing a model with…
Q: Q1: Draw the shear and moment diagrams for the beam. 8k 10 k 0.8 k/ft I momon F-61 12 fi 12 ft B 6…
A:
Q: Use the method of equilibrium (also known as the bifurcation approach) to estimate the critical…
A: To determine - Critical buckling load for the given beam.
Q: Determine the force in member CD (in kN, round-off to 2 decimal places, include "-" if in…
A:
Q: A horizontal curve has a design speed of 50 mph. If e = 0.10 and f = 0.16, find the degree of curve.…
A:
Q: A 2 km pipe of 0.2 m diameter connects two reservoirs. The difference between the water levels in…
A: Given data- Length of the pipe L=2 km=2000 m, Diameter of the pipe d=0.2 m, Difference between water…
Q: 28. If density of liquid is given, hydrostatic can be expressed as p=(pgV)/A. pressure
A: 1. False: The formula for hydrostatic pressure is p=ρgh, where ρ is the density of the liquid, g is…
Q: A potable water containing 104 CFU/100 ml of total Coliform will be disinfected using calcium…
A: The Chick-Watson Law states that the log reduction of microorganisms in water is proportional to the…
Q: I need correct answer only Wheels Loads of 5 kN, 15 kN, 20 kN and 15 kN are 1.5m, 2 m and 2,5 m…
A:
Q: A hydraulic jump forms in a 3-m wide rectangular channel that carries a discharge of 10 cms. The…
A:
Q: Calculate the axial forces in all truss members t 5 L 2 S L/2
A: To determine axial force in each member.
Q: How important is Site Planning for a building and client? Identify at least (5) five with A brief…
A: Site planning is regarded as the most important and artistic aspect of any project.
Q: 11-3. A water treatment plant is designed to treat a flow of 20,000 m³/day. The chlorine dosage is 1…
A: Answer (11-3) Calculation of container size We know that volume of container can be determined…
Q: Determine the forces in members BE and CE of the loaded truss. The forces are positive if in…
A: Given To find Force in member BE and CE
Q: PROBLEMS Using method of joints determine forces in each member of the truss shown, SOLUTION IS IN…
A:
Q: A crate weighing 1,868 lb is supported by three cables as shown. Determine the distance h to which…
A: Given:- The weight of the crate = 1868 lb The maximum tension cable AD can sustain = 616 lb To…
Q: An uncompacted heap of soil has a volume of 10000 m³ and void ratio of 1. If the soil is compacted…
A:
Q: B 60° 100KN 30° 3 m 2 m C
A:
Q: THE VOID SPACE IN A SOIL SAMPLE CONSISTS OF 80% AIR AND 20% WATER. THE DRY UNIT WEIGHT IS 15.7…
A:
Q: THE MOST UNIT WEIGHTS AND DEGREES OF SATURATION OF A SOIL SAMPLE ARE GIVEN AS FOLLOWS: MOIST UNIT…
A:
Q: 1 Draw the influence lines for the reaction (Ay) and shear at internal hinge at C (Vc), use Equation…
A: Given To draw The influence line for reaction Ay The influence line for shear at internal hinge at…
Q: Construct the influence diagrams for the reactions at A, B, and C, and the shear and moment at a…
A: Given that To find,1. Influence line diagrams for Reactions at A,B and C.2. Influence line diagrams…
Q: Situation 3: A wide flange Fixed ended beam has a span of 6 m. It carries a a concentrated load of…
A: span= 6 m Load= 135 kN UDL= 50 kN/m properties of wide flange- A=19000 mm2 d=432 mm bf= 264 mm tf =…
Q: If the BOD3 of a waste water sample is 75 mg/L and reaction rate constant K (base e) is 0.345/day,…
A:
Q: Q1/ A project of 20 houses, according to activity shown in table below with a handover rate of 3…
A: Given : 1 2 3 Activity Manhours per activity (M) Operatives per activity (Given) (Given)…
Q: ▪ Determine the reactions at A, B, and C. Assume that an internal pin is located at C. 6 m 2 kN/m C…
A: Given Data Find the reaction at A, B and C.
Q: 2. Determine the moments at B and C, then draw the shear and moment diagrams for the frame. Assume…
A: Given:- EI is constant To find:- Moment at B and C Shear force and bending moment diagram
Q: A structural beam subjected to sagging bending has a cross section which is an unsymmetrical I…
A:
Q: Two parallel highway roads are to be connected by a reverse curve, each section having the same…
A:
Q: Q3) A retaining structure is given in figure. Calculate the factor of safety against sliding.…
A:
Q: Find the maximum moment at the span of DE Draw the shear and moment diagram of the span of DE…
A: Given : Required : Maximum moment in span DE Shear and moment diagram of span DE
Q: A two-stage cyclone (i.e., two cyclones in series) is designed to remove particulate matter from the…
A: Given:- The geometric mean diameter = 10 μm The geometric standard deviation = 2 To determine:- The…
Q: 8 A long slope is formed in a soil with shear strength parameter C' = 0, o' = 34°. Firm strate lies…
A:
Q: A car travelling at 40 mph on uphill grade of 5%. If the brakes are suddenly applied, it will travel…
A:
Q: A cable subjected to a uniform load of 240 N/m is suspended between two supports at the same level…
A: Given, w = 240 N/m L = 20 m h = 4 m
Q: PROBLEM 7:5 Find the shear stresses in the spar webs and skin of the section shown in the figure…
A: The given data is shown below:
Q: МА RA 20 KN 20 KN MB KAB = 10.67x10⁹ -3m-xl-3m-x-3m-²4 m. RB 60 KN KBC = 9x10⁹ in-de 4 m. a.…
A: Given: A beam with loadings on it Required : Moment distribution table Moment at A, B and C…
Q: 13. Engineering mechanics is a branch of physics. True False 14. Dynamics of rigid bodies is a…
A: Ans 13. The use of mechanics to address issues involving typical engineering components is known…
Q: Incorrect Determine the force in each member of the loaded truss. The force is positive if in…
A:
Q: Differentiate between 'low gravity' and 'high gravity dams. Calculate the limiting height of low…
A:
Q: A timber beam, 100 mm wide and 150 mm deep, supports a UDL over a span of 2 m. If the safe stresses…
A: Given data- A timber beam- Width b=100 mm, Depth d=150 mm, UDL on the span L=2 m = 2000 mm, Safe…
Q: how to derive the maximum force of the simple and cantilever beam or if there are any missing…
A: Answer In order to derive the maximum applied force 'F' we need to know about Bending equation…
Q: Determine the diameter of sludge digestion tank for 40,000 people. The sludge content per capita per…
A: Given- Population P=40,000 Sludge content=0.068 per capita/day, Moisture of sludge=94%, Depth of…
Q: Compute for the depth of compression stress block if the beam has a width of 400mm,effective depth…
A:
A hydraulic excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations? complete solution
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
- An excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations?A loader operating at 107 cy/hr has 2.5-cy heaped capacity bucket and has a 1.2-min load cycle. The trucks have 11-cy capacity and a 30-minute dump + haul + return time. A 95% fill factor applies to the loader. The project works 50-minute hours. Determine the job production for 7 trucks. A 94.70 cy/hr B 95.55 cy/hr C 93.70 cy/hr D 96.70 cy/hrEvaluate cost and production using a 3-cy hoe to load wet gravel into 14-cy-size trucks. Assume a bucket fill factor of 105% and that the hoe bucket swing cycle time is 24 sec. Use the information in table below, a truck net empty weight of 36,860 lb, and a rated payload of 40,000 lb. Dump time will be 1.3 min. The haul distance is 2.5 miles from the pit to the plant up a 3% grade. The rolling resistance of the haul road will be maintained at 3%. The hoe and operator cost $97 per hour, and trucks cost $49 per hour. Assume the efficiency is 60min/hr. 1- What is the truck cycle time? 2- What is the loader cycle time? 3- What is the number of trucks? 4- What is the production of the truck, if you know that the loader will control that production? 5- What is the total cost in dollars $ and in ($/Įcy)? Total Speed(mph) resistance% 35 2 35 4 22.5 12.5 8 7
- Evaluate cost and production using a 3-cy hoe to load wet gravel into 14-cy-size trucks. Assume a bucket fill factor of 105% and that the hoe bucket swing cycle time is 24 sec. Use the information in table below, a truck net empty weight of 36,860 lb, and a rated payload of 40,000 lb. Dump time will be 1.3 min. The haul distance is 2.5 miles from the pit to the plant up a 3% grade. The rolling resistance of the haul road will be maintained at 3%. The hoe and operator cost $97 per hour, and trucks cost $49 per hour. Assume the efficiency is 60min/hr. What is the truck cycle time? What is the loader cycle time? What is the number of trucks? What is the production of the truck, if you know that the loader will control that production? What is the total cost in dollars $ and in ($/lcy)? Total resistance% Speed(mph) 0 35 2 35 4 22.5 6 12.5 8 7Calculate the total operation time for this construction activity if the volume of soil to be removed is 8 cu.m. (considered 33% for bulking of materials.) The speed of dumptruck is 30 kph and travel distance (round trip) from the source to disposal area vice-versa is 6 km. The bucket size of excavator is 0.50 cu.m at 0.50 min loading time, tipping time is 4 mins. a. 15.18 minutes b. 22.02 minutes c. 25.32 minutes d. 30.00 minutes7. A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?
- Calculate number of transit mixers (TM) required for transporting concrete from central batching plant to site. The cycle time data of a 6 m³ typical transit mixers is given below: O Loading time of TM = 6.0 minutes. O Travel time of loaded TM to site= 30 minutes. Average waiting time at site = 5.0 minutes Discharge time of concrete at site through concrete pump = 15 minutes. Travel time for return trip = 24 minutes. If the central batching plant having average output of 60 m³/hr is to run continuously, work out the requirement of no. of concrete pumps and TM.It is determined that a 5-m width-of-cut combine is traveling 1.5-m/s. In one minute’s time 50 kg of grain are collected in the grain tank and 60kg of material are discharged out of the rear of the machine. Find the machine capacities: field capacity, (ha/hr) material capacity (kg/hr), throughput capacity, (ton/hr)do not solve it wrong, uploading for the second time, need detailed solution
- A crawler dozer with (3.2 x 1 y) blade will be used in dozing operation. The martial is a dry Gravel and is to be moved a distance of (300 ft) with a pushing speed of (3 Km/h) and returning speed of (8 Km/h); the job efficiency is assumed to be 45 min/hr. Calculate the cost of moving bank cubic yard if the O&O cost of the dozer is (65 $/h) and the operator wage is (15 $/h). assume the maneuver time is equal to (0.35 min)?A project consists of replacing the truck on an existing existing roadroad line involving 3000 feet of track. The old track can be removed at a rate of 70 feet per hour. The old rail ties can be removed at a rate of 200 feet per hour. The new ties can be installed at a rate of 25 feet per hour, and the installment track can be installed at a rate of 40 feet per hour. show this operation on a linear schedule. Assume that the minimum float for an activity at any location is 1 day.Estimate the hourly production in LCY of a 3 CY articulated wheel loader excavating hard materials from a pit and moving it to a stockpile. The average haul distance is 350 ft and the grade is 10%. The bucket fill factor is 1 and the efficiency is 45 min/hr. Find hourly production in LCY/HR. Please help me with right solution... Urgenttttttttt... Thank you
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)