A good value engineering program should lead to the lowest possible initial project cost. True False
Q: 7 8 1. A contractor has obtained the contract for a large project which is expected to last for five…
A:
Q: 3.3
A: Step 1: Given the information:μs= 0.090 and μk = 0.072 Required:Slope angle θ of the constant-speed…
Q: please solve the following problem with paper and pencil and please show the correct answer and step…
A: Given: L = 28 feetE = 29 x 103 ksi The column height at length L= 28 feet. To simplify calculations,…
Q: Clean handwriting answer it okkk must handwriting thanks. Don't use chat gpt answers okk I use chat…
A: Step 1: Step 2: Step 3: Step 4:
Q: the subject is steel strucure
A: Here's an outline for designing the floor slab with the given parameters and compiling the…
Q: Eigenvalues and eigenvectors
A: The matrix is: [7-2-4] [30-2] [6-3-2] To find eigenvalues, we solve the characteristic equation:…
Q: Complete the earthwork calculation sheet here and plot the resulting mass diagram. Divide ccy by 0.9…
A: Repeat these calculations for all stations and calculate the running sum for each station. Once all…
Q: The construction of the core of an earth dam requires 320,000 cubic yards (yd3) of clay. The core…
A: To calculate the total cost of constructing the core of an earth dam for two contractors, A and B,…
Q: Kindly help, I'll like the solution and answer. Thanks. A 18-m fixed-ended beam is supported at…
A: The total load on the beam is the sum of the distributed load and the concentrated load. The…
Q: Solve using paper:Problem 16 Determine the resultant of the three cable tensions that act on the…
A:
Q: Solve using paper:PROBLEM 19: The horizontal top of a concrete column is subjected to the system of…
A:
Q: A 9 kN/m 6m 6 KN/m 3m
A:
Q: How many equations will be needed for the shear diagram of the following beam? 6 KN 3 m 36 kN m ↑…
A: Approach to solving the question: I analyzed the question before answering it. Key…
Q: Trying to see if I did this right or how to adjust formulas. This is not a graded assignment I have…
A: Let's go through the step-by-step guide to set this up in Excel. Step 1: Set Up the Structure in…
Q: Calculations are not right. incorrect forward pass and backward pass. there are incorrect numbers.…
A: PROBLEM 1:PROBLEM 2: PART 1 AND PART 2
Q: Determine the moment of inertia of the area about the y axis I, and the radius of gyration ky. 160…
A: 1. Divide the Area into Simple Shapes:We will divide the given composite area into three…
Q: From the given truss shown compute the force in member ED FD, and FC
A: Step 1: Step 2:
Q: ANALYSE THE FRAME AND FIND IT'S REACTIONS AND INTERNAL MOMENT USING THE FORCE METHOA 4kN/m Assume EI…
A: The Problem:The given frame is a simply supported beam with a uniformly distributed load (UDL) of 4…
Q: Please solve the following problem step by step so I can understand.
A: Approach to solving the question: Detailed explanation:Examples: Key references:
Q: The T-Beam shown is to resist a factored moment of 1500 kN.m. Design the tension steel requirements…
A:
Q: number of significant digits; the tolerance is +_1 in the third significant digit
A: See image below for the explanation.
Q: Determine, using cantilever and equilibrium calculations, transverse force and moment diagrams for…
A: Solution:
Q: Determine the force in the bars BC, BF and EF, use the method of sections, draw and the solution…
A: Step 1: Step 2: Step 3
Q: 4.4.4
A:
Q: Solve the following linear programming problem using the simplex method: Maximize Z = 5x + 3y…
A: I hope this helped you and you learned a lot :) If you have any questions or clarification, do not…
Q: 2.2 Graphs should be drawn directly under and aligned with the beam diagram. Graphs should include…
A:
Q: Grades of g₁ = -2.50% and 92 = +1.50%, VPI elevation 860.00 ft at station 22 +00, and a fixed…
A: To solve this problem, we need to calculate the elevations of an equal-tangent vertical curve given…
Q: 4.
A: Step 1:Step 2:
Q: use autocad Draw the structural details of the following sections (an elevation view and a side…
A: Note: First-angle projection is used. CAD MODEL: You can access files…
Q: Clay soils are formed primarily due to chemical weathering of parent rocks. True False
A: Clay soils are formed as a result of the weathering process of parent rocks. Weathering is a process…
Q: Calculations are not right. incorrect forward pass and backward pass. there are incorrect numbers.…
A: Detailed explanation:(First Image)1. Forward PassThis calculates the earliest start (ES) and finish…
Q: Xz Select the lightest W section of A36 steel to serve as a main member 30 ft long to carry an axial…
A:
Q: SUBJECT: Theory of Structure Determine the force in each member of the truss shown by the method of…
A: ## Analyzing the Truss Using the Method of Joints**Understanding the Problem:**We are given a truss…
Q: EX = Acontinuous Beam Composed of three spans (1,2 and 3) is to be sequentially constructive spans…
A: The image contains an exercise about a continuous beam composed of three spans (1, 2, and 3). The…
Q: 1. Use calculus to solve the equation dv/dt = g - (c/m)v where the initial velocity is nonzero. 2.…
A: Use calculus to solve the equation dv/dt = g - (c/m)v where the initial velocity is nonzero. a…
Q: 24 DE what is the force in BD?
A:
Q: A three-story hotel (that is two framed floors and a roof, no basement) has interior columns thatare…
A:
Q: Please solve the following problwm with step by step solutions so I can understand .
A: Step 1:Step 2: Step 3: Step 4:
Q: SOLVE THE FOLLOWING PROBLEM WITH STEP BY STEP SOLUTIONS SO I CAN UNDERSTAND THE PROBLEM WELL. PLEASE…
A: Ixx = (1/12) * b * h^3 Ixx = Ixx_centroid + A * d^2The total moment of inertia of…
Q: Please solve this problem correctly.
A: Step 1:Step 2:Step 3:
Q: A manufacturing company has three warehouses and four retail outlets. The monthly demand at each…
A: Network Diagram of the Manufacturing CompanyKEYTransportation Costs:From W1 to R1: 5From W1 to R2:…
Q: A wheel tractor-scraper is operating on a level grade. Assume no power derating is required for…
A: Problem 1: Maximum Rolling Resistance at 10 mph We need to determine the maximum rolling…
Q: Disturbed by speeding cars outside his workplace, Nobel laureate Arthur Holly Compton designed a…
A: Part (a)Given:- Mass of the car, m=1800kg- Radius of the arc, r=20.2m- Speed of the car,…
Q: In a plasticity chart, the 'A-line' separates silts from clays. True False
A: In soil mechanics, a plasticity chart is a graphical representation of the plasticity…
Q: A simple house project can be structured as follows (9 work packages total): • Design: Ground plans…
A: Here's a proposed Work Breakdown Structure (WBS) with some additional sub-tasks:1. House Project1.1…
Q: asap please
A: First, we need to calculate the force exerted by the platform on the stone column. This force is…
Q: Answer fast
A:
Q: Answer fast and draw diagram
A: Step 1: Position Vectors for Points A and BThe coordinates of point A are A(0,0,0).The coordinates…
Q: Given the following, how many total hours are required for the following activities given that:…
A: To calculate the total hours required for each activity, we'll use the following steps:1. Calculate…
Q: 1. Assumptions and Specifications:- **Material for Frames:** A36 or A992 steel- **Material for…
A: 1. Material PropertiesA36 SteelYield Strength Fy = 250 Mpa ultimate Strength Fu = 400-550MPa A992…
A good value engineering program should lead to the lowest possible initial project cost.
Unlock instant AI solutions
Tap the button
to generate a solution
Click the button to generate
a solution
- I am still having trouble undertsanding this, can you please explain it bettera) BIM software popularity has increased due to: Choice 1 Extreme ease of use Choice 2 Designer preference Choice 3 Project owners requiring it Choice 4 Low purchase price b) To avoid Insurance Subrogation risk, a party to a contract needs to: Choice 1 Add itself as named-insured Choice 2 Ask for leniency Choice 3 Ask for tail coverage Choice 4 All of the above c) Why are standard contract forms preferred in construction projects? Choice 1 Elimination of lawyer fees Choice 2 Easier to understand Choice 3 Are inexpensive to purchase Choice 4 None of aboveThe use of Design-Build projects has been decreasing. T or F Design-build eliminates the need for an owner to deal with a separate designer and contractor. Tor F Discuss the potential benefits of using design-build on project.
- Cost estimation plays a vital role in the success of any project. Explain the different tools and techniques due to which the process of cost estimation takes place.What is the significance of cost estimates in project cost management?The difference between a Participant and a Stakeholder can best be described as: A Stakeholder is involved for the life of the project and the Participant is involved for a short duration. Stakeholders are involved periodically and Participants are involved continuously There is no difference A Participant is involved for the life of the project and the Stakeholder is involved for a short duration.
- Briefly describe the difference between "Construction Management at Fee and Construction Management at Risk".is a dimensionless number associated with a point in time and/or location that illustrates the cost at that time or location relative to a base point in time or base location. A Cost Estimates B Cost Indexing Cost Analysis D Cost ComparisonDuring a healthcare construction project, which of the following project delivery methods would a project team use where LEAN principles and building information modeling are utilized to the greatest extent possible? A. Integrated project delivery B. Design-bid-build C. Guaranteed maximum price D. Design-build