A company currently using an inspection process in its material receiving department is trying to install an overall cost reduction program. One possible reduction is the elimination of one inspection position. This position tests material that has a defective content on the average of 0.04. By inspecting all items, the inspector is able to remove all defects. The inspector can inspect 50 units per hour. The hourly rate including fringe benefits for this position is $9. If the inspection position is eliminated, defects will go into product assembly and will have to be replaced later at a cost of $10 each when they are detected in final product testing. Assume that the line will operate at the same rate (i.e., the inspection rate) if the inspection operation was eliminated. a-1. If the inspector position is eliminated, what will the hourly cost of defects be? a-2. Should this inspection position be eliminated based on costs alone? multiple choice Yes No b. What is the cost to inspect each unit? Note: Round your answer to 2 decimal places. c. Is there benefit (or loss) from the current inspection process? How much? Note: Input all amounts as positive values. Round "per unit" value to 2 decimal places.
A company currently using an inspection process in its material receiving department is trying to install an overall cost reduction program. One possible reduction is the elimination of one inspection position. This position tests material that has a defective content on the average of 0.04. By inspecting all items, the inspector is able to remove all defects. The inspector can inspect 50 units per hour. The hourly rate including
Assume that the line will operate at the same rate (i.e., the inspection rate) if the inspection operation was eliminated.
a-1. If the inspector position is eliminated, what will the hourly cost of defects be?
a-2. Should this inspection position be eliminated based on costs alone?
multiple choice
-
Yes
-
No
b. What is the cost to inspect each unit?
Note: Round your answer to 2 decimal places.
c. Is there benefit (or loss) from the current inspection process? How much?