A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, S500, and $400 each, respectively. How many of each unit should be built I theater and how many should be rented to minimize total cost? s needed at $14 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden the E Click the icon to view the table of carpentry and painting hours. The optimal integer solution is to build flat(s) and rent flat(s); build hanging drop(s) and rent hanging drop(s); build prop(s) and rent prop(s). This solution gives the V cost, which is Sn (Type whole numbers.) Carpentry and painting hours Flats Hanging Drops Props Caгpentry 0.5 2.0 Painting 3.0 13.0 4.0 3.0 Print Done

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has
two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $14 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden
tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the
theater and how many should be rented to minimize total cost?
E Click the icon to view the table of carpentry and painting hours.
The optimal integer solution is to build flat(s) and rent flat(s); build hanging drop(s) and rent hanging drop(s); build
(Type whole numbers.)
prop(s) and rent prop(s). This solution gives the
V cost, which is s
- X
Carpentry and painting hours
Сагрentry
Painting
Flats
Hanging Drops
Props
0.5
3.0
2.0
13.0
3.0
4.0
Print
Done
Transcribed Image Text:A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $14 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost? E Click the icon to view the table of carpentry and painting hours. The optimal integer solution is to build flat(s) and rent flat(s); build hanging drop(s) and rent hanging drop(s); build (Type whole numbers.) prop(s) and rent prop(s). This solution gives the V cost, which is s - X Carpentry and painting hours Сагрentry Painting Flats Hanging Drops Props 0.5 3.0 2.0 13.0 3.0 4.0 Print Done
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman