Flint lab produces 4 high tech product types. Each of the products must be wired, drilled, assembled and checked for quality standard before being delivered to consumers. The time requirement and profit for each product are as follows. Product A: 0.5 hr for wiring, 3 hrs for drilling, 1 hr for assembling, and 0.5 hr for inspection. One product A can be sold for $10 per unit. Product B: 1.5 hr for wiring, 1 hrs for drilling, 3 hrs for assembling, and 1 hr for inspection. One product B can be sold for $13 per unit. Product C: 1.5 hr for wiring, 2 hrs for drilling, 3 hrs for assembling, and 0.5 hr for inspection. One product C can be sold for $16 per unit. Product D: 1 hr for wiring, 3 hrs for drilling, 2 hrs for assembling, and 0.5 hr for inspection. One product D can be sold for $12 per unit. The maximum capacity for wiring, drilling, assembly, and inspection are 1500 hrs; 2350 hrs; 2600 hrs; and 1200 hrs respectively. Flint lab requires that there will be at least 150 units of A, 100 units of B, 300 units of C, and 400 units of D being produced. In addition, Flint lab wants that total production of products A and B accounts for at least 40% of total production. Formulate the linear programming problem to maximize the profit and satisfy the production constraints.

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Flint lab produces 4 high tech product types. Each of the products must be wired, drilled, assembled and checked for quality standard before being delivered to consumers. The time requirement and profit for each product are as follows. Product A: 0.5 hr for wiring, 3 hrs for drilling, 1 hr for assembling, and 0.5 hr for inspection. One product A can be sold for $10 per unit. Product B: 1.5 hr for wiring, 1 hrs for drilling, 3 hrs for assembling, and 1 hr for inspection. One product B can be sold for $13 per unit. Product C: 1.5 hr for wiring, 2 hrs for drilling, 3 hrs for assembling, and 0.5 hr for inspection. One product C can be sold for $16 per unit. Product D: 1 hr for wiring, 3 hrs for drilling, 2 hrs for assembling, and 0.5 hr for inspection. One product D can be sold for $12 per unit. The maximum capacity for wiring, drilling, assembly, and inspection are 1500 hrs; 2350 hrs; 2600 hrs; and 1200 hrs respectively. Flint lab requires that there will be at least 150 units of A, 100 units of B, 300 units of C, and 400 units of D being produced. In addition, Flint lab wants that total production of products A and B accounts for at least 40% of total production. Formulate the linear programming problem to maximize the profit and satisfy the production constraints.

 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman