A city needs to make improvements to its wastewater treatment system in order to comply with new State regulations. The plant's average discharge is 30 million gallons per day (mgd). Because the regulations are not yet finalized, your cost estimate on the low and high side is $7 million to $18 million. Additional annual costs are between $143,000 and $264,000. Assume a project life of 30 years and a discount rate of 5%. Determine the Expected Present Value and its standard deviation. What is the probability that the Expected Present value cost is greater than $16 million?
Unitary Method
The word “unitary” comes from the word “unit”, which means a single and complete entity. In this method, we find the value of a unit product from the given number of products, and then we solve for the other number of products.
Speed, Time, and Distance
Imagine you and 3 of your friends are planning to go to the playground at 6 in the evening. Your house is one mile away from the playground and one of your friends named Jim must start at 5 pm to reach the playground by walk. The other two friends are 3 miles away.
Profit and Loss
The amount earned or lost on the sale of one or more items is referred to as the profit or loss on that item.
Units and Measurements
Measurements and comparisons are the foundation of science and engineering. We, therefore, need rules that tell us how things are measured and compared. For these measurements and comparisons, we perform certain experiments, and we will need the experiments to set up the devices.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 4 images