A bridge has been constructed between the mainland and an island. The total cost (excluding tolls) to travel across the bridge is expressed as C- 50 + 0.5V, where V is the number of veh/hr and Cis the cost/vehicle in cents. The demand for travel across the bridge is V- 2500 - 10C. (a) Determine the volume of traffic across the bridge. (b) If a toll of 25 cents is added, what is the volume across the bridge? What volume would be expected with a 50 cent increase? (c) A tollbooth is to be added, thus reducing the travel time to cross the bridge. The new cost function is C- 50 + 0.2V. Determine the volume of traffic that would cross the bridge

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A bridge has been constructed between the mainland and an island. The total cost (excluding tolls) to travel across the bridge is
expressed as C- 50 + 0.5V, where V is the number of veh/hr and Cis the cost/vehicle in cents. The demand for travel across the bridge
is V- 2500 - 10C.
(a) Determine the volume of traffic across the bridge.
(b) If a toll of 25 cents is added, what is the volume across the bridge? What volume would be expected with a 50 cent increase?
155
(c) A tollbooth is to be added, thus reducing the travel time to cross the bridge. The new cost function is C- 50 + 0.2V. Determine the
volume of traffic that would cross the bridge.
(d) Determine the toll to yield the highest revenue for demand and supply function in part (a), and the associated demand and revenue
Transcribed Image Text:A bridge has been constructed between the mainland and an island. The total cost (excluding tolls) to travel across the bridge is expressed as C- 50 + 0.5V, where V is the number of veh/hr and Cis the cost/vehicle in cents. The demand for travel across the bridge is V- 2500 - 10C. (a) Determine the volume of traffic across the bridge. (b) If a toll of 25 cents is added, what is the volume across the bridge? What volume would be expected with a 50 cent increase? 155 (c) A tollbooth is to be added, thus reducing the travel time to cross the bridge. The new cost function is C- 50 + 0.2V. Determine the volume of traffic that would cross the bridge. (d) Determine the toll to yield the highest revenue for demand and supply function in part (a), and the associated demand and revenue
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Estimating construction costs
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning