The total number of trips from ABC to XYC is 4500. All of the trips are made using car. The government proposed two alternatives, a train and a bus. The utility is given by the equation: U = -0.05(TT)-0.04(WT) - 0.07(W) - 0.2(F) - 0.2(P) TT in-vehicle travel time WT- walking time to terminal W-waiting time F-fare P-parking cost The travel time for private car is 20 minutes, 12 for bus and 10 for train. Walking time for different terminals for bus and train is 10 and 15 minutes respectively. The waiting time is 8 and 6 minutes for bus and train respectively, and the fare for car, bus and train is at $20, $8.5 and $7 dollars respectively. Parking cost for car is $3. What is the total number of trips by train?
The total number of trips from ABC to XYC is 4500. All of the trips are made using car. The government proposed two alternatives, a train and a bus. The utility is given by the equation: U = -0.05(TT)-0.04(WT) - 0.07(W) - 0.2(F) - 0.2(P) TT in-vehicle travel time WT- walking time to terminal W-waiting time F-fare P-parking cost The travel time for private car is 20 minutes, 12 for bus and 10 for train. Walking time for different terminals for bus and train is 10 and 15 minutes respectively. The waiting time is 8 and 6 minutes for bus and train respectively, and the fare for car, bus and train is at $20, $8.5 and $7 dollars respectively. Parking cost for car is $3. What is the total number of trips by train?
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:The total number of trips from ABC to XYC is 4500. All of the trips are made using car. The government proposed two
alternatives, a train and a bus. The utility is given by the equation:
U = -0.05(TT)-0.04(WT) - 0.07(W) - 0.2(F) - 0.2(P)
TT in-vehicle travel time
WT- walking time to terminal
W-waiting time
F-fare
P-parking cost
The travel time for private car is 20 minutes, 12 for bus and 10 for train. Walking time for different terminals for bus and
train is 10 and 15 minutes respectively. The waiting time is 8 and 6 minutes for bus and train respectively, and the fare for
car, bus and train is at $20, $8.5 and $7 dollars respectively. Parking cost for car is $3.
What is the total number of trips by train?
Expert Solution

Step 1
Given data :
TT= in vehicle travel time
WT= walking time
W= waiting time
F=fare
P= parking cost
Step by step
Solved in 2 steps

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning