A 10-meter wide concrete road pavement 600 meters long is desired to be constructed over a well-compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade, a 550 cu.m. Of sand filling is necessary, over which the, 35-cm concrete pavement will be placed. How much will the project cost, allowing for 15% contingency, and assuming the following data: (a) Sandfill, including rolling and watering- P15.00 per cu.m (b) Concrete curb and gutter (labor and materials) - P12.00per linear meter. (c) Concrete pavement, 25 cm thick (labor and materials), including curing- P25.00 per sqm.
A 10-meter wide concrete road pavement 600 meters long is desired to be constructed over a well-compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade, a 550 cu.m. Of sand filling is necessary, over which the, 35-cm concrete pavement will be placed. How much will the project cost, allowing for 15% contingency, and assuming the following data: (a) Sandfill, including rolling and watering- P15.00 per cu.m (b) Concrete curb and gutter (labor and materials) - P12.00per linear meter. (c) Concrete pavement, 25 cm thick (labor and materials), including curing- P25.00 per sqm.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
A 10-meter wide concrete road pavement 600 meters long is desired to be constructed over a well-compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade, a 550 cu.m. Of sand filling is necessary, over which the, 35-cm concrete pavement will be placed. How much will the project cost, allowing for 15% contingency, and assuming the following data: (a) Sandfill, including rolling and watering- P15.00 per cu.m (b) Concrete curb and gutter (labor and materials) - P12.00per linear meter. (c) Concrete pavement, 25 cm thick (labor and materials), including curing- P25.00 per sqm.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning