A 7000 meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are necessary where there is a poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The dimensions of the excavated trench were 0.8 m deep by 10 meter wide and 3.5 kilometers long. The road will have 100 mm aggregate base and 50 mm of asphalt thickness. A bulldozer displaced 115 m³\day, at a rate of 100 cedis per day. A laterite soil will be used in the fill operation. The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis. Daily labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a truck driver will be employed for the fill operations. Grading and asphalt laying will require: fine grading and crew 848 cedis per day for 12 days Base preparation crew and equipment for 10 days at 780 Cedis per day. Paving crew and equipment for 5 days at 848 Cedis per day, prime equipment and crew for 5 days at 446 Cedis per day. Seal equipment and crew for 8 days at 332 Cedis per day. Add 10 percent as overhead cost. Material requirements for 56,000 m² of road are given as Materials Quantity (tons) Asphalt 5714 Seal oil 36 Sand 260 11467 1581 35000 Aggregate Prime Lateritic fill material Determine the total cost for the road. . Cedi\ton 50 34 16 18 34 8
A 7000 meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are necessary where there is a poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The dimensions of the excavated trench were 0.8 m deep by 10 meter wide and 3.5 kilometers long. The road will have 100 mm aggregate base and 50 mm of asphalt thickness. A bulldozer displaced 115 m³\day, at a rate of 100 cedis per day. A laterite soil will be used in the fill operation. The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis. Daily labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a truck driver will be employed for the fill operations. Grading and asphalt laying will require: fine grading and crew 848 cedis per day for 12 days Base preparation crew and equipment for 10 days at 780 Cedis per day. Paving crew and equipment for 5 days at 848 Cedis per day, prime equipment and crew for 5 days at 446 Cedis per day. Seal equipment and crew for 8 days at 332 Cedis per day. Add 10 percent as overhead cost. Material requirements for 56,000 m² of road are given as Materials Quantity (tons) Asphalt 5714 Seal oil 36 Sand 260 11467 1581 35000 Aggregate Prime Lateritic fill material Determine the total cost for the road. . Cedi\ton 50 34 16 18 34 8
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
![A 7000 meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are
necessary where there is a poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The
dimensions of the excavated trench were 0.8 m deep by 10 meter wide and 3.5 kilometers long. The road
will have 100 mm aggregate base and 50 mm of asphalt thickness.
A bulldozer displaced 115 m \day, at a rate of 100 cedis per day. A laterite soil will be used in the fill
operation. The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a
cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a
foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis. Daily
labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a
truck driver will be employed for the fill operations. Grading and asphalt laying will require: fine grading
and crew 848 cedis per day for 12 days Base preparation crew and equipment for 10 days at 780 Cedis per
day. Paving crew and equipment for 5 days at 848 Cedis per day, prime equipment and crew for 5 days at
446 Cedis per day. Seal equipment and crew for 8 days at 332 Cedis per day. Add 10 percent as overhead
cost.
Material requirements for 56,000 m? of road are given as
Materials
Quantity (tons)
. Cedi\ton
Asphalt
5714
50
Seal oil
36
34
Sand
260
16
Aggregate
11467
18
Prime
1581
34
Lateritic fill material
35000
8
Determine the total cost for the road.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F45a55842-2bfc-4adc-98f2-f243324c00cd%2F20a4ed6a-a06b-46e2-806c-393cc35f1929%2Fy0pnvk6_processed.png&w=3840&q=75)
Transcribed Image Text:A 7000 meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are
necessary where there is a poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The
dimensions of the excavated trench were 0.8 m deep by 10 meter wide and 3.5 kilometers long. The road
will have 100 mm aggregate base and 50 mm of asphalt thickness.
A bulldozer displaced 115 m \day, at a rate of 100 cedis per day. A laterite soil will be used in the fill
operation. The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a
cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a
foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis. Daily
labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a
truck driver will be employed for the fill operations. Grading and asphalt laying will require: fine grading
and crew 848 cedis per day for 12 days Base preparation crew and equipment for 10 days at 780 Cedis per
day. Paving crew and equipment for 5 days at 848 Cedis per day, prime equipment and crew for 5 days at
446 Cedis per day. Seal equipment and crew for 8 days at 332 Cedis per day. Add 10 percent as overhead
cost.
Material requirements for 56,000 m? of road are given as
Materials
Quantity (tons)
. Cedi\ton
Asphalt
5714
50
Seal oil
36
34
Sand
260
16
Aggregate
11467
18
Prime
1581
34
Lateritic fill material
35000
8
Determine the total cost for the road.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 6 steps with 28 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning