A 1.2 m rice reaper operates at an average speed of 4 km/h. The average width of cut is 20 cm less than the rated width. The average time for turning, adjusting, clearing of clogged cutting blades, transferring to other fields to be harvested, and other miscellaneous interruptions amounted to 15% of the theoretical operating time. Every two hours of operation, the fuel tank has to be refilled and refueling takes an average time of 10 minutes per hectare. Downtime, including changing of operators takes an average of 5 minutes per hectare. Determine: a. Theoretical Field Capacity b. Effective Field Capacity c. Field Efficiency

icon
Related questions
Question

1. A 1.2 m rice reaper operates at an average speed of 4 km/h. The average width of cut is 20 cm less than the rated width. The average time for turning, adjusting, clearing of clogged cutting blades, transferring to other fields to be harvested, and other miscellaneous interruptions amounted to 15% of the theoretical operating time. Every two hours of operation, the fuel tank has to be refilled and refueling takes an average time of 10 minutes per hectare. Downtime, including changing of operators takes an average of 5 minutes per hectare. Determine:

a. Theoretical Field Capacity

b. Effective Field Capacity

c. Field Efficiency

 

 

A 1.2 m rice reaper operates at an average speed of 4 km/h. The average width of cut is 20 cm less
than the rated width. The average time for turning, adjusting, clearing of clogged cutting blades,
transferring to other fields to be harvested, and other miscellaneous interruptions amounted to 15%
of the theoretical operating time. Every two hours of operation, the fuel tank has to be refilled and
refueling takes an average time of 10 minutes per hectare. Downtime, including changing of operators
takes an average of 5 minutes per hectare. Determine:
Theoretical Field Capacity
Effective Field Capacity
Field Efficiency
1.
a.
b.
с.
Transcribed Image Text:A 1.2 m rice reaper operates at an average speed of 4 km/h. The average width of cut is 20 cm less than the rated width. The average time for turning, adjusting, clearing of clogged cutting blades, transferring to other fields to be harvested, and other miscellaneous interruptions amounted to 15% of the theoretical operating time. Every two hours of operation, the fuel tank has to be refilled and refueling takes an average time of 10 minutes per hectare. Downtime, including changing of operators takes an average of 5 minutes per hectare. Determine: Theoretical Field Capacity Effective Field Capacity Field Efficiency 1. a. b. с.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions