9.5 A crawler hoe having a 24 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for cach condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, $0.377/bcy; condition 3: 99 bey/hr, S1.101/bey) Condition (1) (2) (3) Rock, poorly blasted Sand and Moist loam, earth Material gravel 12 10 100 Depth of excavation (ft) Angle of swing (degrees) Percent swell Efficiency factor (min per hr) 15 60 80 14 50 45 50

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
9.5 A crawler hoe having a 24 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul
units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard
for cach condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy; condition 3: 99 bey/hr, S1.101/bcy)
Condition
(1)
(2)
(3)
Moist loam,
earth
Rock, poorly
blasted
Material
Sand and
gravel
12
80
10
Depth of excavation (ft)
Angle of swing (degrees)
Percent swell
Efficiency factor (min per hr)
15
60
100
14
50
45
50
Transcribed Image Text:9.5 A crawler hoe having a 24 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for cach condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy; condition 3: 99 bey/hr, S1.101/bcy) Condition (1) (2) (3) Moist loam, earth Rock, poorly blasted Material Sand and gravel 12 80 10 Depth of excavation (ft) Angle of swing (degrees) Percent swell Efficiency factor (min per hr) 15 60 100 14 50 45 50
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Measuring sitework, excavation and piling
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning