6. A process at a watch assembly plant has been changed. The process is divided into three work elements (see table below). A time study has been performed with the following results. The time standard for the process previously was 14.5 minutes. Based on the new time study, should the time standard be revised (essay & calculation format)? The new time study had an initial sample of four observations, with the results shown in the following table. The performance rating factor (RF) is shown for each element, and the allowance for the whole process is 18 percent of the total normal time. Element 1 Element 2 Element 3 Obs 1 Obs 2 2.60 2.34 4.94 4.78 2.18 1.98 Obs 3 3.12 5.10 2.13 Obs 4 2.86 4.68 2.25 Average (min) 2.730 4.875 2.135 RF Normal Time 1.0 1.1 0.9 2.730 5.363 1.922

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
6. A process at a watch assembly plant has been changed. The process is divided into three work
elements (see table below). A time study has been performed with the following results. The
time standard for the process previously was 14.5 minutes.
Based on the new time study, should the time standard be revised (essay & calculation
format)?
The new time study had an initial sample of four observations, with the results shown in the
following table. The performance rating factor (RF) is shown for each element, and the
allowance for the whole process is 18 percent of the total normal time.
Element 1
Element 2
Element 3
Obs 1 Obs 2
2.60
2.34
4.94
4.78
2.18
1.98
Obs 3
3.12
5.10
2.13
Obs 4
2.86
4.68
2.25
Average (min)
2.730
4.875
2.135
RF Normal Time
1.0
1.1
0.9
2.730
5.363
1.922
Transcribed Image Text:6. A process at a watch assembly plant has been changed. The process is divided into three work elements (see table below). A time study has been performed with the following results. The time standard for the process previously was 14.5 minutes. Based on the new time study, should the time standard be revised (essay & calculation format)? The new time study had an initial sample of four observations, with the results shown in the following table. The performance rating factor (RF) is shown for each element, and the allowance for the whole process is 18 percent of the total normal time. Element 1 Element 2 Element 3 Obs 1 Obs 2 2.60 2.34 4.94 4.78 2.18 1.98 Obs 3 3.12 5.10 2.13 Obs 4 2.86 4.68 2.25 Average (min) 2.730 4.875 2.135 RF Normal Time 1.0 1.1 0.9 2.730 5.363 1.922
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.