2) Consider a warehouse that has 4,500 available storage locations. The standard time and resources for each activity in the warehouse is given in the table below: Activity Unit Receive Check Put away Restack Pick Move Check Load Case People standard (Minutes) 2.0 Case 0.5 Case 3.0 Case 1.5 Case 0.3 Case 2.0 Case 5.0 Case 3.0 a. Calculate the average used storage locations of the warehouse. Given that the average storage space utilization of that warehouse is 85%. b. If a loader can load 150 cases per shift, what is that loader's performance? c. If the warehouse's average input is 1,500 cases on a daily basis, how many receivers does the company need to recruit to avoid congestion at the input? Given that the average performance of receivers is 85%.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
please answer all parts of the question within 30 minutes with detailed explanation. Make sure calculation form part of the answer and are in details for better understanding. If calculations are not shown or are poorly done i will surely give negative ratings.
2) Consider a warehouse that has 4,500 available storage locations. The
standard time and resources for each activity in the warehouse is given in the
table below:
Activity Unit
People
standard
(Minutes)
Receive
Case 2.0
Check
Case 0.5
Put
away
Case 3.0
Restack
Case 1.5
Pick
Case 0.3
Move
Case 2.0
Check
Case 5.0
Load
Case 3.0
a. Calculate the average used storage locations of the warehouse. Given that the
average storage space utilization of that warehouse is 85%.
b. If a loader can load 150 cases per shift, what is that loader's performance?
c. If the warehouse's average input is 1,500 cases on a daily basis, how many
receivers does the company need to recruit to avoid congestion at the input?
Given that the average performance of receivers is 85%.
Transcribed Image Text:2) Consider a warehouse that has 4,500 available storage locations. The standard time and resources for each activity in the warehouse is given in the table below: Activity Unit People standard (Minutes) Receive Case 2.0 Check Case 0.5 Put away Case 3.0 Restack Case 1.5 Pick Case 0.3 Move Case 2.0 Check Case 5.0 Load Case 3.0 a. Calculate the average used storage locations of the warehouse. Given that the average storage space utilization of that warehouse is 85%. b. If a loader can load 150 cases per shift, what is that loader's performance? c. If the warehouse's average input is 1,500 cases on a daily basis, how many receivers does the company need to recruit to avoid congestion at the input? Given that the average performance of receivers is 85%.
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,