(10 points) Problem 4. Suppose only through traffic is allowed on an intersection approach, and traffic arrive at a constant rate of 400 veh/h. Their effective green time is set to 15 seconds. Cycle length is 60 seconds. Estimate the average delay for that approach. Use a saturation flow rate of 1750 veh/h; D/D/1 queuing. Centenniam ad) of gy dov yasm wof ni emil

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter8: Intersection Control
Section: Chapter Questions
Problem 17P
icon
Related questions
Question
(10 points) Problem 4. Suppose only through traffic is allowed on an intersection approach, and traffic
arrive at a constant rate of 400 veh/h. Their effective green time is set to 15 seconds. Cycle length is 60
seconds. Estimate the average delay for that approach. Use a saturation flow rate of 1750 veh/h; D/D/1
queuing.
Centenniam ad) of gy
dov yasm wof
ni emil
Transcribed Image Text:(10 points) Problem 4. Suppose only through traffic is allowed on an intersection approach, and traffic arrive at a constant rate of 400 veh/h. Their effective green time is set to 15 seconds. Cycle length is 60 seconds. Estimate the average delay for that approach. Use a saturation flow rate of 1750 veh/h; D/D/1 queuing. Centenniam ad) of gy dov yasm wof ni emil
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning