1. Design the cantilever sheet pile wall supporting a loose sand fill as shown in the following Figure. The surcharge is equal to 10 kPa. GWT is at the same height on both sides, and assume yw=10kN/m³. Based on the log spiral solutions, the Ka for the loose sand is 0.3 while the Ka and Kp for the dense sand are 0.2 and 13.125, respectively. a) For a factor of safety of 2 on the passive resistance, determine the required depth of penetration depth, D. (initial trial with D'=4.2m) b) Determine the bending moment of the sheet pile. D 7.0m. 2.0m Yt = 16.5 kN/m³ $' = 30° Loose sand fill: Yt 19.5 kN/m3 = 30° Dense sand: q=10 kN/m²

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
1. Design the cantilever sheet pile wall supporting a loose sand fill as shown in the
following Figure. The surcharge is equal to 10 kPa. GWT is at the same height on
both sides, and assume yw 10kN/m³. Based on the log spiral solutions, the K₂ for the
loose sand is 0.3 while the Ka and Kp for the dense sand are 0.2 and 13.125,
respectively.
a) For a factor of safety of 2 on the passive resistance, determine the required depth of
penetration depth, D. (initial trial with D'=4.2m)
b) Determine the bending moment of the sheet pile.
7.0m.
D
2.0m
Yt = 16.5 kN/m³
$' = 30°
Loose sand fill:
Yt 19.5 kN/m3
= 30°
Dense sand:
Yt= 21 kN/m³
$' = 40°
q=10 kN/m²
Transcribed Image Text:1. Design the cantilever sheet pile wall supporting a loose sand fill as shown in the following Figure. The surcharge is equal to 10 kPa. GWT is at the same height on both sides, and assume yw 10kN/m³. Based on the log spiral solutions, the K₂ for the loose sand is 0.3 while the Ka and Kp for the dense sand are 0.2 and 13.125, respectively. a) For a factor of safety of 2 on the passive resistance, determine the required depth of penetration depth, D. (initial trial with D'=4.2m) b) Determine the bending moment of the sheet pile. 7.0m. D 2.0m Yt = 16.5 kN/m³ $' = 30° Loose sand fill: Yt 19.5 kN/m3 = 30° Dense sand: Yt= 21 kN/m³ $' = 40° q=10 kN/m²
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Highway drainage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning