1. A small manufacturing plant makes three types of inflatable boats: one-person, two-person, and four-person models. Each boat requires the service of three departments, as listed on the table. The cutting, assembly, and packaging departments have a maximum of 380, 330, and 120 labor- hours per week, respective. Department One-Person Boat Two-Person Boat Four-Person Boat Cutting 0.5 hours 1.0 hours 1.5 hours Assembly 0.6 hours 0.9 hours 1.2 hours Packaging 0.2 hours 0.3 hours 0.5 hours How many boats of each type must be produced each week for the plant to operate at full capacity? Make sure to label the variables using a complete sentence, write the system of equations, write the corresponding augmented matrix, solve using matrix methods, and write your answer as a complete sentence (you might need to use the other side of the page)

Algebra and Trigonometry (6th Edition)
6th Edition
ISBN:9780134463216
Author:Robert F. Blitzer
Publisher:Robert F. Blitzer
ChapterP: Prerequisites: Fundamental Concepts Of Algebra
Section: Chapter Questions
Problem 1MCCP: In Exercises 1-25, simplify the given expression or perform the indicated operation (and simplify,...
icon
Related questions
Question
1. A small manufacturing plant makes three types of inflatable boats: one-person, two-person, and
four-person models. Each boat requires the service of three departments, as listed on the table.
The cutting, assembly, and packaging departments have a maximum of 380, 330, and 120 labor-
hours per week, respective.
Department
One-Person Boat
Two-Person Boat
Four-Person Boat
Cutting
0.5 hours
1.0 hours
1.5 hours
Assembly
0.6 hours
0.9 hours
1.2 hours
Packaging
0.2 hours
0.3 hours
0.5 hours
How many boats of each type must be produced each week for the plant to operate at full capacity?
Make sure to label the variables using a complete sentence, write the system of equations, write the
corresponding augmented matrix, solve using matrix methods, and write your answer as a complete
sentence (you might need to use the other side of the page)
Transcribed Image Text:1. A small manufacturing plant makes three types of inflatable boats: one-person, two-person, and four-person models. Each boat requires the service of three departments, as listed on the table. The cutting, assembly, and packaging departments have a maximum of 380, 330, and 120 labor- hours per week, respective. Department One-Person Boat Two-Person Boat Four-Person Boat Cutting 0.5 hours 1.0 hours 1.5 hours Assembly 0.6 hours 0.9 hours 1.2 hours Packaging 0.2 hours 0.3 hours 0.5 hours How many boats of each type must be produced each week for the plant to operate at full capacity? Make sure to label the variables using a complete sentence, write the system of equations, write the corresponding augmented matrix, solve using matrix methods, and write your answer as a complete sentence (you might need to use the other side of the page)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
Recommended textbooks for you
Algebra and Trigonometry (6th Edition)
Algebra and Trigonometry (6th Edition)
Algebra
ISBN:
9780134463216
Author:
Robert F. Blitzer
Publisher:
PEARSON
Contemporary Abstract Algebra
Contemporary Abstract Algebra
Algebra
ISBN:
9781305657960
Author:
Joseph Gallian
Publisher:
Cengage Learning
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
Algebra And Trigonometry (11th Edition)
Algebra And Trigonometry (11th Edition)
Algebra
ISBN:
9780135163078
Author:
Michael Sullivan
Publisher:
PEARSON
Introduction to Linear Algebra, Fifth Edition
Introduction to Linear Algebra, Fifth Edition
Algebra
ISBN:
9780980232776
Author:
Gilbert Strang
Publisher:
Wellesley-Cambridge Press
College Algebra (Collegiate Math)
College Algebra (Collegiate Math)
Algebra
ISBN:
9780077836344
Author:
Julie Miller, Donna Gerken
Publisher:
McGraw-Hill Education